The Bicker Fen substation is the new substation which processes the electricity generated by the onshore wind farm. The power is then fed into the National Grids’ existing Walpole Substation. Alpha was contracted to construct civils elements of works to the client’s design. Our works included the construction of numerous piled foundations, super grid transformer bunds, a control building which includes a steel structure with composite cladding walls and roof complete with internal blockwork partitions and full M&E installation.

Experience Hours (Planning & Scheduling): 
1700
Experience Hours (Cost Management): 
200
Experience Hours (Forensic Analysis): 
300

Planning & Project Control Engineer, ARCHIRODON CONSTRUCTION (OVERSEAS), & Power infrastructure works and 132kv/66kv substation distibution station

START Date: 
July, 2010
END Date: 
April, 2011

 • Developed comprehensive baseline CPM schedule.

• Responsible for opening, updating and closing cost centers of the project.

• Allocated the resources for activities and calculate productivity of projects.

• Updated schedules and analyzed manpower and cost allocations.

• Cost Estimation.

• Maintained a report of actual cost against estimated budget for all current projects at the site operations and submitted it monthly.

• Forecasted the estimate at completion to anticipate the cost trend of the project.

Experience Hours (Planning & Scheduling): 
1500
Experience Hours (Cost Management): 
300
Experience Hours (Forensic Analysis): 
100

Electrical Engineer, Arabian aircondition contracting WLL, Black Cat Engineering & Construction Co. W.L.L, & Power infrastructure works and 132kv/66kv substation distibution station

START Date: 
November, 1982
END Date: 
January, 2010

i am  electrical engineer  performs dutties as  project engineer     MEP Building  services

project exprience gained in  dubai ,qatar  kuwait, having demonstrate the abillity to  support adviese range of  highprofile projects vis- a- vis development

proven ability to  perform in management capacity with  robust communication presentation, movtivation and construction infrastructrure  and peroperty  sector

Experience Hours (Planning & Scheduling): 
8700
Experience Hours (Cost Management): 
4000
Experience Hours (Forensic Analysis): 
1550