Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Shipbuilding

Senior Scheduler, Comstock Engineering, Various Industrial Mill Projects

START Date: 
May, 1987
END Date: 
September, 1990

Duties: Responsible for overall planning and coordination of scheduling department. Performed presentations of scheduling and cost control capabilities to prospective clients and in house personnel.

Experience Hours (Planning & Scheduling): 
5350
Experience Hours (Cost Management): 
1000
Experience Hours (Forensic Analysis): 
350

Junior Engineer Planning & Control, Steeloflex Engineers Pvt Ltd, Steel Plant Construction

START Date: 
January, 1992
END Date: 
July, 1996

Construction Management at field in structural erectio of rolling mill and calcining furnace.

Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Cost Management): 
50

Contract & Cost Control Engineer, PT. SMOE Indonesia, Australia Pacific LNG Plant (Client: Conoco Philips. LNG Contractor: Bechtel), LNG Contractor: Bechtel), Wheatstone LNG Plant (Client: Chevron

START Date: 
December, 2012

Pre-qualification of contractor, negotiate terms and conditions, prepare and review contract documents prior agreement. Evaluate contractor’s works, monitor and record all variation orders, verification of claims and recommend for payments. Review formal correspondence and maintain contractual record and control of all contract correspondences. Prepare, review and submit reimbursable claims to client include provided labours (non-manual and craft), lease of fabrication areas and workshops, client’s offices, purchased of materials, services, subcontracts, etc.

Experience Hours (Cost Management): 
8000

QA QC INSPECTOR& ENGINEER (PIPING / WELDING), Hyundai Engineering & Construction Co. Limited, MAADEN REFINERY & GASCO

START Date: 
September, 2015
END Date: 
September, 2016

DUTIES AND JOBS RESPONSIBILITIES:-

---

Visual inspection of fit up and welding joint. Performing visual inspection as per code specification or follow the procedure.

Inspection and witness all site quality activities like electrode, fit up, weld visual etc.

Renganathan Rengarajan

First Name: 
Renganathan
Last Name: 
Rengarajan
Professional Since: 
Aug-2007 (16.7 yrs experience)
Years Experience: 
0

Mizan Majumder

First Name: 
Mizan
Last Name: 
Majumder
Hands-on technical leader with extensive experience designing, installing, and maintaining innovative marine, mechanical and structural systems. Bachelor of Science in Naval Architecture & Marine Engineering and Master of Applied Science in Mechanical Engineering with particular expertise in the marine, oil and gas, manufacturing, and utilities industries. Creative, service-oriented problem solver adept at driving continuous improvement and enhancing quality while controlling costs and eliminating waste.
Professional Since: 
Mar-1980 (44.1 yrs experience)
Oldest experience: 
Feb 2016 (8.2 yrs experience, WARNING: 35.9 years variance with Professional Since)
Years Experience: 
47

VP of Operations, Canadian Alberni Engineering, Boatbuilding & repairs

START Date: 
February, 2016

VP of Operations

Overall incharge of Canadian Alberni Engineering looking after general and engineering management, day to day operational issues in boatbuilding, repairs and other industrial projects in logging and other local industries.

Experience Hours (Planning & Scheduling): 
1000
Experience Hours (Cost Management): 
400
Experience Hours (Forensic Analysis): 
300

Simultaneous Translator, Gama Industries, Cement Factory Construction, Ankara, Turkey

START Date: 
June, 1992
END Date: 
July, 1992

Simultaneous Translator.

I was the simultaneous translator for two Frenchmen temporarily assigned to supervise the first ever locally constructed rotary oven of a cement factory in Ankara.

Simultaneous translation basically between French & Turkish with management and workers and French and English when English speakers connected with the Frenchmen.

This got me interested in Industrial Projects. :)

PLANNING ENGINEER, Jurong Shipyard Pte Ltd, Maersk Convincer; Petrojack IV; Atwood Osprey; Seadrill West Elara

START Date: 
February, 2008
END Date: 
October, 2010

Schedule Setup

Setup Schedule based on Contract WBS in line with company planning policies and guidelines.

Usage of Manpower / KPIs to determine durations of activities and to plan for construction sequencing.

Setup of physical progress measurement using key measurables (Steel Tonnage / Pipe Spools / Cable Length / Termination points etc)

 

Schedule Analysis and Control / Problem Solving

Conduct weekly analysis of schedule (Float, Critical Path, Manpower, Resource)

Experience Hours (Planning & Scheduling): 
5000
Experience Hours (Cost Management): 
250

eri don

First Name: 
eri
Last Name: 
don

With 14 years experiences in the filed of various stell Contruction

Professional Since: 
Mar-1982 (42.1 yrs experience)
Years Experience: 
0

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content