Seconded to the Willbros Spie Capag Joint Venture.
Responsible for detailed construction planning for the Chad to Cameroon pipeline project. Project comprised the construction of 1071 km of 30” pipeline, 48 valve stations, 3 pump stations and a pressure reduction station.