China Petroleum Engineering & Construction Group-CPECC

Clay Zhao

First Name: 
Clay
Last Name: 
Zhao
Oldest experience: 
Jul 1998 (25.8 yrs experience, WARNING: 28.5 years variance with Professional Since)
Years Experience: 
41

Assistant Project Manager / Project Planner, China Petroleum Engineering & Construction Group-CPECC, Abu Dhabi Crude Oil Pipeline Project

START Date: 
July, 1998

 

Over 13years experience in the oil and gas industry with the last 3 years being devoted to project control management of Abu Dhabi Crude Oil Pipeline Project (ADCOP). Abu Dhabi Crude Oil Pipeline Project is a 3.3 billion USDcrude oil facilities project in UAE. The Client is International Petroleum Investment Co. (IPIC).The scope of work includes 405Km, 48” pipeline construction, main pump station and intermediate pump station, oil terminal with 3 offshore SPM’s, 10 nos. 100 million barrel oil storage tanks, Tie-in to existing facilities, and SCADA system.

CONSTRUCTION/PLANNING ENGINEER, China Petroleum Engineering & Construction Group-CPECC, TOPPING CONDENSATE & REFINERY EXPANSION SKIDKA

START Date: 
June, 2006
END Date: 
October, 2007

.. Main responsibilities to develop overall schedule includes engineering, procurement,
construction, commissioning, and startup activities.
.. To prepare resource histogram of project staff, manpower and plant & equipment.
.. To develop a CPM program along with q network logic diagram to the details of level 4
from master schedule and all comply with the contract using Primavera software
.. Developing the formats for project monthly & weekly report
..

PLANNER /SCHEDULER, China Petroleum Engineering & Construction Group-CPECC, White Oil Pipeline Project (WOPP) (865 Kilometers Cross-country Pipeline)

START Date: 
October, 2003
END Date: 
December, 2004
  • Plan and extract weekly / monthly look a head schedules updates & analysis.
  • Identify all critical paths within a project by using float path analysis.              
  • Detail working schedule for the arrival of equipment loading for the erection of planned equipment.
  • Allocate resources to activities using distribution curves to accurately reflect how the work is performed.
  • Analyze changes between versions of schedules with Claim Digger to understand the progress that has tak
Experience Hours (Planning & Scheduling): 
2450
Experience Hours (Cost Management): 
0