Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Senior Civil Engineer, Daito Construction Co. Ltd, Roads and Bridges

START Date: 
October, 1993
END Date: 
September, 1999

As project site Supervisor (1993 to 1999), I was responsible to execute works among others, such as:

A. Construction of Steel Structured Warehouse with the following detailed works:

  • Fabrication of Structural Members
  • Ensures fabrication was under the specified Technical Drawing and specifications (JIS)
  • Erections and Grouting.
  • Erection/Dismantling of Scaffolding and Platforms.
  • Installation of Roofing Sheets and sidings
  • Coating and Painting works.
  • Prepares Project Records, Documentations.
  • Involved in Project Turn-Over.

B. Construction of Asphalt-paved By-Pass Highways out-skirting Omuta city, tasked to supervised for:

  • Site Preparation
  •  Establishing Line and grade
  • Earth works
  • Preparation of base and sub-base course.
  • Asphalt paving
  • Fabrication and Installation of Road run-off Ditches and Drainage System, Road crossing structures for irrigation.
  • Grouting
  • Construction of Road railings and anti-erosion rip-rap, gavions, road signs structures and lighting and pedestrian Structures.

C. Supervised and implements activities for 1- span Rail road crossing bridge construction which scope are:

  • Site preparation and Temporary facilities- construct temporary platforms, fabrication yards and facilities, temporary foundations for equipments, temporary gantry for lifting and laying-in, installation of temporary rail-ways for transporting and installing massive Post-Stress Reinforced Concrete Girders.
  • Supervised construction of Bridge approach and Wing Walls.
  • Supervised construction/fabrication of long span Reinforced concrete girders and Post-Tensioning of tendons and grouting
  • Supervised hauling, installing of Girders through a conventional transporting, installation and lifting method.
  • Supervised installation of reinforcement bars, concreting and post tensioning of concrete deck and grouting.
  • Removal of temporary structures.