Project Control Consultant , GMH Planning Limited , Mitsubishi Electric Europe B.V - Networks Islington Substation Project & Loondon Underground Infrastructural Renewal Project
Responsible for developing a detailed, logic linked, resourced and cost loaded programme that aligns with the submitted Activity Schedule that conforms to the minimum level of detail required within the WBS structure attached. Ensured the programme demonstrates compliance with the sectional completion dates & Contractors time risk allowances.
&
Responsible for the construction delivery Planning of Ballast Track Replacement (BTR) and Points & Crossings (P&C) Projects according to the End to End (T-Minus) Process from a work bank of projects in Primavera P6 and weekend possession works using the approved output rate to produce Time Chainage & Primavera P6 programme. Preparation of the Train Matrix by calculating the volume of spoils and materials each train can bring & take out of site during the possession. Carry out quantitative schedule risk analysis (QSRA) on every programme before possession weekend work is carried out. Build Time Risk Allowance in the programme if required.
- Company:
- Industry:
- Job Role:
- Project:
- Region:
- Skills & Expertise: