Project Planner

Project Planner, Parsons Brinckerhoff Ltd, Stalybridge Signalling Enhancements GRIP 4

START Date: 
October, 2007
END Date: 
February, 2011

Project Planner on: Stalybridge Signalling Enhancements GRIP 4, £295k value, produced resourced and fully costed multi-disciplinary tender programme and maintained and progressed the Live version in liaison with engineers.  Plumstead Sidings Critical Advanced Work, GRIP 4 & 5, removal of sidings and buffer stops, £180k value, produced resourced and fully costed multi-disciplinary tender programme and maintained and progressed the Live version in liaison with engineers.  Salisbury Signalling Enhancement GRIP 4, £175k value, produced resourced and fully costed multi-discipl

Project Planner, Prokeram und Glas GmbH, Glass Wool Plant (Serpuchov Russia)

START Date: 
March, 2002
END Date: 
July, 2005

Project Planner

Tasks:

Planning & Controlling

About the Project:

Contract: Consultant & Engineering

Scope: Engineering, Procurement, Construction & Commissioning Supervision

Experience Hours (Planning & Scheduling): 
4050
Experience Hours (Cost Management): 
1500
Experience Hours (Forensic Analysis): 
1000

Project Planner, John Holland Pty Ltd, Sugarloaf pipeline, VIC

START Date: 
August, 2008
END Date: 
January, 2010

This role required me to step-up a gear in programme development, the co-ordination / integration of various parties and the collection and presentation of project schedule related information. Coming from a predominately claims background, an Alliance seemed a little foreign. Although design was on-going and changing throughout construction the same date for practical completion remained and thus the programme was highly dynamic.

Project Planner, Wates Construction, Major Construction Projects

START Date: 
May, 2012

I am a project planner for a top 10 UK contractor working in the construction division. I manage several projects when they reach site as well as undering tenders and then managing the process through design and pre construction into the construction phase.

Project Planner, Downer, Airport Runway, Bridges, Irrigation Systems., Roading, Stormwater, Various Civil Infrastructures: Building Construction, Wastewater, Watermain

START Date: 
January, 2012

Project Planning, Scheduling, Monitoring & Controlling, Progress Reporting, Performance Measurement, Cost Forecasting.

Experience Hours (Planning & Scheduling): 
3500
Experience Hours (Cost Management): 
1500
Experience Hours (Forensic Analysis): 
1500

Project Planner, Laing O'Rourke Australia, NWTP

START Date: 
February, 2012
  • Develop project schedules and tender schedules in Primavera P6
  • Develop and/or maintain Excel spreadsheets as required to support the schedules
  • If assigned to a project, help maintain the progress of the project schedule as directed by the senior planner

Project Planner , Fabricom Contracting Ltd, Boston Massachusetts Utilities - Distrigas LNG distribution module

START Date: 
March, 2001
END Date: 
July, 2001
  • Develop from the contractual programme a working level 4 programme for the civil, equipment installation, cable installation and pre-commissioning work (Static Var Compensators, Harmonic Filters, Unisafe 22kV Switchgear) at 7 bulk load sites around the LUL rail network.
  • Liaise with ABB Sweden, Alfreton, and Ellesmere Port on the delivery and Factory Acceptance Test dates.
  • Weekly site visits to review and collaborate progress and attend site vendor meetings.
  • Produce progress reports to the client as per period payment profiles.
  • At completion of installati

Project Planner , London Underground Limited, Northern Line Upgrade Project

START Date: 
August, 2001
END Date: 
January, 2002

Project Planner on a Private Finance Project to install Power Quality Equipment to the value of £65 Million for London Underground Limited (LUL) as part of a variance to the Northern Line Upgrade project.

Project Planner, Fabricom Contracting Ltd, ICHP Auxiliary Boiler Installation

START Date: 
January, 2002
END Date: 
May, 2003

ICHP Auxiliary Boiler Installation with associated ductwork, steelwork and pipe work.

  •  Develop installation programme for ductwork, steelwork access and pipe work for two Auxiliary Boilers for client Foster Wheeler.
  • Project Engineer pipe work erection packs, pipe support requirements and progress tracking documentation.

Saturate Gas Plant £8 million rebuild, managed by Fluor Limited for Conoco Limited’s Humber Oil Refinery.