• Attended pre-construction meetings and assisted in the planning process.
• Studied drawings, quantity take off and preparation of preliminary schedules.
• Prepared temporary site layout schemes & site logistic plans.
• Prepared design programmes for different work packages and identified major interfaces between packages.
• Prepare & issued stage programmes.