Kier Build Planner

START Date: 
February, 2009
END Date: 
July, 2009
•     Attended pre-construction meetings and assisted in the planning process.
•     Studied drawings, quantity take off and preparation of preliminary schedules.
•     Prepared temporary site layout schemes & site logistic plans.
•     Prepared design programmes for different work packages and identified major interfaces between packages.
•     Prepare & issued stage programmes.
•     Attend meetings and collaborative workshops with contractors to identify interfaces and highlight criticality of interdependencies.
•     Underwent training in ‘Asta Power Project’.
•     Played a vital role in redefining planning related procedures- both pre and post contract procedures.