Hello Everyone,

I have been on the EPC projects from Contractors side till now for O & G company. I would like to learn when a engineering company is awarded FEED Study (Basis of Design & Statement of requirement is given by the Client) who from the engineering company will prepare the list of document to be prepared for the FEED Study, as the Planning Engineer would require the details to prepare a schedule.