Continuous Flight Piling outputs.

1 reply [Last post]
Alex Leites
User offline. Last seen 7 years 43 weeks ago. Offline
Joined: 27 Jul 2006
Posts: 3
Groups: None
Can somebody please point me in the right direction of outputs for Continuous flight piling.
The piles are between 6 and 8 metres on about 3m of made up ground (gravel/sand) and the bottom 3-5 on sandstone.
Thank you.

Replies

Andrew Flowerdew
User offline. Last seen 2 years 23 weeks ago. Offline
Joined: 14 Dec 2004
Posts: 960
Groups: None
Alex,

What diameter are the piles and how hard is the sandstone?

If you want advice then May Gurney Integrated Services Ltd run the largest fleet of CFA rigs in the UK and would no doubt be interested in helping. (01603 727272)

The number of piles a day could range from a couple to ten or a dozen a day depending on the above info.