How to upload a set of Activity Codes?

No replies
Rodney Jones
User offline. Last seen 1 year 9 weeks ago. Offline
Joined: 18 Jun 2012
Posts: 65
Groups: None

Hi All,

 

I have created some Activity Codes to be assigned for accounting purposes. The first stage was easy as there were only 8 groups and maybe 5 or 6 codes within each group.

Sample: Code Value Description

2 Tailings/BPF Area  2.1 C-12394-01-02-05-07  2.2 C-12394-01-02-05-06  2.3 C-12394-01-02-04-04  2.4 C-12394-01-02-05-07  2.5 C-12394-01-02-05-07  2.6 C-12394-01-02-06-03  2.7 C-12394-01-02-04-06 but now the request is to expand the listing and groupings to an additional level as below:
2 2Tailings/BPF Area
2.1C-12394-01-02-05-062.1Bulk Earthworks BPF area
2.1C-12394-01-02-05-062.1.1Bulk excavation of BPF pad & roads areas to subgrade - spoil to material to Water treatment plant area (Subject to remeasure against actual)
2.1C-12394-01-02-05-062.1.2Excavate and trim Drain A
2.1C-12394-01-02-05-062.1.3Excavate and trim Drain B
2.1C-12394-01-02-05-062.1.4Supply, Place, Compact and trim pavement to BPF Pad & roads
2.1C-12394-01-02-05-062.1.5Supply & Installation of culverts & head walls to Drain A & B
2.1C-12394-01-02-05-062.1.6Supply, place geofabrics & rock works to Drain A & Drain B outlets
2.1C-12394-01-02-05-062.1.7Supply and installation drain A Gabion wall
2.1C-12394-01-02-05-062.1.8Form road side safety bunds
2.1C-12394-01-02-05-062.1.9Excavate, form and pour concrete spoon drain
2.1C-12394-01-02-05-062.1.10Drainage bund at CV1097
2.1C-12394-01-02-05-062.1.11Supply and Installation of conduit services (Subject to remeasure against actual)

How can I upload the codes spreadsheet?

 

Thanks,

 

Rod