Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

PLANNING ENGINEER, KNM Process Systems Sdn Bhd, Columns, Fabrication of Equiments (Pressure Vessel, Heat Exchanger, Reactors, Skids, Tanks etc.)

START Date: 
April, 2008
END Date: 
May, 2011
First route of Planning Engineer in Oil & Gas field where exposure in planning cum project handed. Involved in various design, fabrication, construction, costing and preparing proposal to furnish oil & gas equipment’s such as pressure vessels, heat exchangers, skid, column, storage tanks, piping spools, supply labour and the other oil & gas equipment. Dealing with local and mostly international client, basic responsibilities are as follow: 
  1. Study & Review of Contract upon awarded by client to identify the contractual completion, job scope, Milestone Payment and Contract amount including to foreseen any variation works needed.
  2. Prepare a Fabrication Schedule, Progress S-Curve Chart, Weighted Percentage Progress Checklist, Manpower Schedule, Equipment Schedule and Fabrication Yard Layout Plan for work area/space planning.
  3. Prepare recovery plan to maintain contractual schedule and discuss with all concerned department heads for implementation and recommend mitigation action for problems encountered during fabrication period  that behind the schedule.
  4. Develop a Variation Order upon changes of scope from Contract and prepare necessary documents for possible change order claims and analysis the impact on schedule.
  5. Check weekly/daily accomplishment/activities concern to meet schedule. Follow-up material status to ensure continuous supply of material and advise on requirement date of material procurement including analysis the impact of material arrival to the Project Schedule.
  6. Prepare correspondence to client and maintain a continuous smooth communication with shop and field representatives to ensure orderly supply and delivery of fabricated items.
List of Project involved - (Office Based (HQ) located at Seri Kembangan, Selangor)
NoProjectPhaseClient
11 Unit Autoclave for Million Ounce Plant Upgrade Project, Lihir Island.Manufacturing/FabricationWES/Lihir Gold Limited
28 Units Various Towers for SPT Olefins Recovery Project, Jurong Island, Singapore.Manufacturing/FabricationStone & Webster USA
32 Units C3 Splitter Towers for SPT Olefins Recovery Project, Jurong Island, Singapore.Manufacturing/FabricationStone & Webster USA
42 Units CS Towers for SPT Olefins Recovery Project, Jurong Island, Singapore.Manufacturing/FabricationStone & Webster USA
519 Units Mixer & 17 Settler Tanks for Ambatovy Project, Madagascar.Manufacturing/FabricationStone & Webster USA
610 Vessels (NACE) for Bongkot Phase 4A Project, Thailand.Manufacturing/FabricationHyundai Heavy Industry (HHI).
7Vessels, Shell & Tube Heat Exchangers & 10 Skids for Cupiagua Gas Plant, Colombia.Manufacturing/FabricationProsernat.
8Liquid KO Drum for HF Alkylation Project, Phase 2 S. Africa..Manufacturing/FabricationFoster Wheeler South Africa
91 Neutralizing Drum for HF Alkylation Project, Phase 2 S. Africa.Manufacturing/FabricationFoster Wheeler South Africa
101 Acid Regenerator for HF Alkylation Project, Phase 2 S. Africa.Manufacturing/FabricationFoster Wheeler South Africa
111 Primary Polymer Surge Drum for HF Alkylation Project, Phase 2 S. Africa.Manufacturing/FabricationFoster Wheeler South Africa
12GSU & SRU Skids for Kharyaga Plant, Russia.Manufacturing/FabricationProsernat.

 

List of Project involved - (Fabrication yard Base located at KEE (KNM Exotic Equipment, Shah Alam.)
NoProjectPhaseClient
11 Sulphur Catchpot Vessel for Methanol Plant, Malaysia.Manufacturing/FabricationPML
2EPC Contract for 750 td Biodiesel Plant at Kuantan Port, Malaysia – Vessels.Manufacturing/FabricationMission Biofuels
3EPC Contract for 750 td Biodiesel Plant at Kuantan Port, Malaysia – Heat Exchanger.Manufacturing/FabricationMission Biofuels
4Space Simulator Project, MalaysiaManufacturing/FabricationFBMICOSS
53 Columns for Asian Third PillarProject, China.Manufacturing/FabricationDow Corning
66 Columns for Asian Third PillarProject, ChinaManufacturing/FabricationDow Corning
79 SS & Clad Vessels for Peru LNG Export Facility Project, Peru.Manufacturing/FabricationCB&I / Southern Tropic Material Supply Co.
836 Drums, Columns & Towers for Shell Bukom Refinery Modification Project, SingaporeManufacturing/FabricationFoster Wheeler Eastern / Shell
944 Vessels for Yarwun 2 Project, AustraliaManufacturing/FabricationBechtel Australia

 

Contribution/Activities Joined:
  • Committee Member for KNM Sport & Recretion Club (SPARK) – 2009 ~ 2011.
  • Organizer for KNM Director’s Retirement Farewell 2010.
  • Represent KNM’s for Terry Fox Charity Run 2009.
  • Attend Oil & Gas Asia (OGA) Exhibition 2009.
  • Various KNM Sports conducted since 2008 (Netball & Fishing)
Experience Hours (Planning & Scheduling): 
5500
Experience Hours (Cost Management): 
500

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.