Primavera P6

How to install Primavera P6 Professional 16.1 Stand-alone

After downloading the installation file from Oracle, unzip it.

Qualitative / Quantitative Risk Assessment in Primavera P6 EPPM R15.2

One of the good things about being a consultant is being able to find (or build!) more opportunities across a wide range of projects and clients an

What is the Resource Currency selection in Primavera P6 used for?

In Resource window -> Details tab, there is an selection box called “Currency”.

How does Resource Shift Calendar in Primavera P6 work?

In Primavera P6 -> Resources window -> Units & Prices tab, there is a selection box called Shift Calendar

How to Level Resources / Resource Leveling without changing Project Finish date in Primavera P6

Normally when we Level Resources, Primavera will delay an activity so that Resource is not overloaded. It can make Project Finish date delay.

How can we make Project Finish date not delay? I’ll explain in this article.

How does “Top Down Estimation” in Primavera P6 work?

In Primavera we have a function called “Top Down Estimation” which help us to calculate an estimated figure for Labor and Non-labor unit based on “estimation weights”. It can apply to WBS and Activity.

How to display Multiple Critical path in Primavera P6

In Primavera, when we filter critical path, it only show 1 critical path. In complicated project, we might need to show some more “near critical” path.

I will show you how to do it.

How does “Level Resources” in Primavera P6 work?

Primavera have a function (called Level Resources) to solve the overload resource problem.

I will explain how does it work in this article.