Website Upgrade Incoming - we're working on a new look (and speed!) standby while we deliver the project

Algeria (AF.DZ)

KBR (Kellogg, Brown & Root) Design & Construction Lead Planner

START Date: 
November, 2003
END Date: 
May, 2006
Lead Planning & Scheduling Engineer on several Projects. Team leader and mentor

Hess Corporation Planner

START Date: 
January, 2010
Current Role

ENCC Project Engineer

START Date: 
November, 1996
END Date: 
October, 1998
Duties:

o     Writing procedures, work packages, manuals and reports, updating drawings and models, perform calculations and other design verification work to ensure that maintenance and modification work is carried out in a timely manner and according to standards.
o     Participate in production follow up and documentation work to the extent needed
o     Participate in project work with engineers from other disciplines and other offices

TARSI Spa Project Engineer

START Date: 
November, 1998
END Date: 
October, 2000
Duties:

o     Assist, when required, in the preparation of tender including, design drawing, plant and site layout arrangement, use of formwork and tender documentation.
o     Consistently meeting clients for analysis of needs, site inspection & meeting, negotiation and closing deal.
o     Providing support to clients, finding new project leads, new clients and handle client’s feedbacks.

SARPI Spa (JV between Sonatrach and ABB) Project Engineer

START Date: 
November, 2000
END Date: 
March, 2002
Duties:

o     Manage the Call for Tender dossier
o     Implement company’s referential
o     Manage bid analysis and issue recommendation to award
o     Manage execution of detailed engineering

Projects which I worked in:

-     16” pipeline for SONA-Hess (JV between Hess and Sonatrach)
-     Revamping of OK1 Pumps stations (04 pumps)
-     Many small projects.

Brown & Root - Condor Spa. Lead Planner

START Date: 
March, 2002
END Date: 
September, 2007
(JV between Sonatrach and KBR)
Duties:

o     Ensure Contractor’s project schedules and manpower histograms are prepared, recorded, analysed, monitored and controlled against Contract requirements.
o     Monitor, control and report current and forecast progress against approved Contract schedules to enable project and corporate management to ensure that final project turnover dates are within the approved Contract schedule.

Senior Planning Engineer, Saipem Spa, Full field developement/ LNG Projects/Refinery upgrade/Power Plants/Pipelines

START Date: 
October, 2007

Duties:

-     Assist, when required, in the preparation of tender method statement including, design and detailed drawing planning, plant and site layout arrangement planning, use of formwork and tender documentation.
-     Prepare summary of contract details on which the execution programme will be based.
-     Integrates each projects program into the total projects planning scheme.

slb Planner

START Date: 
January, 2010
Current Role

China-GEO Engineering (CGC) Lead Planner

START Date: 
May, 2001
END Date: 
April, 2004
being a lead planner for a water supply project.

START Date: 
May, 2008
Project Control Team

Market Place