START Date:
January, 2015
The Cargo Transportation Route (CaTRo) constitutes part of infrastructure scope associated with the Future Growth Project (FGP). CaTRo enables delivery of modules and general cargo to the FGP construction site in Tengiz. The scope includes dredging of the marine channel (ca 71 Km long), construction of Cargo Offloading Facility including turning basin, two moorages and six berth.