Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

China State Construction Engineering Corporation (CSCEC)

li sheng

First Name: 
li
Last Name: 
sheng
Professional Since: 
Jul-2013 (10.8 yrs experience)
Years Experience: 
0

Jimmy Xie

First Name: 
Jimmy
Last Name: 
Xie

Working on on steel strcuture works.

Professional Since: 
Jul-2011 (12.8 yrs experience)
Years Experience: 
0

PLANNING MANAGER, China State Construction Engineering Corporation (CSCEC), MTR & KCRC Railway Projects, Site Development, Disneyland Project

START Date: 
December, 2001
END Date: 
April, 2007

1. JORDAN VALLEY SITE DEVELOPMENT Project in Hong Kong. It compasses a 1 Million cu.m. Rock Blasting/Excavation and built the longest Rock Conveyor, new roads and subway tunnels.

2. KCRC SOUTERN LINK RAILWAY TUNNEL (KDB300 & 200). More than 2 km floating railway tunnel construction using open-cut excavation, massive diaphragm, bored piles, secant walls, temporary sheet pile cofferdams, ground freezing, sophisticated ground investigation and instrumentations. In-charge of the tendering package and the project construction baseline.

PLANNING MANAGER, China State Construction Engineering Corporation (CSCEC), CITY OF DREAMS - Hotels & Casino Resort

START Date: 
May, 2006
END Date: 
September, 2010

PLANNING MANAGER for:

"City of Dreams - Hotels and Casino Resort" - Macau (approx. USD 3B)
CASINO RESORT featuring 2000 hotel rooms and an underwater themed gambling casino.
A joint venture project (Leighton-China State-John Holland JV) for the design & build of:

4 nos. of luxury HOTELS

  • 34 flrs - Crown Hotel
  • 30 flrs - Hardrock Hotel
  • 32 flr-Hyatt Regency
  • 35 flrs-Grand Hyatt

Casino & Retails:

  • 34,500 sq.m. Retails and Casino Gaming Area


 

Paul Peralta

First Name: 
Paul
Last Name: 
Peralta

I am a Planning Engineer. I am working in the construction industry. My job is to make a master programme and control the progress by gauging the project's performance index using either the SPI or CPI or both and recommend a mitigation measures in able to meet the target completion within the budget without compromising the quality of the work and worksmanship.

Professional Since: 
Dec-1994 (29.4 yrs experience)
Years Experience: 
0

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content