Planning Engineer, Descon Engineering Limited Pakistan, UCH-II Power Project 400MW

START Date: 
August, 2011
END Date: 
August, 2013
  • Preparation of Integrated Project Schedule as baseline on Primavera (P6).
  • To determine Scope of work, Work Breakdown Structure (WBS), Organization   
  • Breakdown Structure (OBS) and Work procedures/ Methodologies
  • Preparation of Weekly and Monthly Progress report for client.
  • Analysis & Forecasting of reports and Schedule Plans
  • Preparation of Interim Payment Certificates and Costing
  • Preliminary working on sub-contracting and tendering.
  • Preparation of Rate Analysis of Non BOQ’s item.
  • Preparation of Claims i.e. Idle Cost Claim, Electricity Back Charge Claim
  • To ensure control of updated versions of drawings, specifications, obsolete documents and that all activities at site are carried out on latest revisions