START Date:
August, 2011
END Date:
August, 2013 - Preparation of Integrated Project Schedule as baseline on Primavera (P6).
- To determine Scope of work, Work Breakdown Structure (WBS), Organization
- Breakdown Structure (OBS) and Work procedures/ Methodologies
- Preparation of Weekly and Monthly Progress report for client.
- Analysis & Forecasting of reports and Schedule Plans
- Preparation of Interim Payment Certificates and Costing
- Preliminary working on sub-contracting and tendering.
- Preparation of Rate Analysis of Non BOQ’s item.
- Preparation of Claims i.e. Idle Cost Claim, Electricity Back Charge Claim
- To ensure control of updated versions of drawings, specifications, obsolete documents and that all activities at site are carried out on latest revisions