PLANNING ENGINEER, Abdulla Nass Group , DBOM Al Dhakhira Sewage treatment Plant & associated Pipe line works

START Date: 
November, 2016

Abdulla Nass Group  
Planning Engineer                                                                                                         
                           
Project: Design, Build, Operate & Maintain (DBOM) Contract for Al Dhakhira Sewage Treatment Works,
Al Dhakhira Transfer Pumping Station and Associated Pipelines
Client: Ashghal (Public Works Authority – Qatar)
PM/ CM: Louis Berger Intl.  
Designer: ASCO  
Main Contractor: JV of Hyundai-Rotem (Construction) & Aqualia- MACE (Maintenance)  
TPS & Pipelines Contractor: Abdulla Nass Group  
Project Value: QAR 436.7 Million ($ 119.64 million)  
Component II of the project includes the construction of a new foul sewage Transfer Pumping Station
(TPS), foul sewage transmission mains and Treated Sewage Effluent (TSE) transmission mains. The new
sewage Transfer Pumping Station will be constructed within the site of the existing Al Dhakhira STW and
serve a population of 147,500 with a peak flow of 1,386 L/s. The foul sewage transmission mains will
comprise approximately 21 km of 800 mm twin rising mains and approximately 10 km of 500 mm twin
rising mains. The Treated Sewage Effluent (TSE) transmission system will consist of approximately 36 km
of TSE rising mains of various diameters (most of the order of 800 mm).