Planner, AECOM, New Terminal B and Inter-terminal people-mover system
START Date:
July, 2014 Scheduling the design, procurement and construction of a new domestic terminal and people-mover system.
The people-mover system will connect the 3 existing international terminals on the south end of the airport to a new domestic terminal to be built on the north end of the airport on the site of the existing soviet-era Terminal B, to be demolished in 2015. Project scheduled to be completed by the 2018 world cup.