Senior Planning Engineer, Shell Projects & Technologies, Majnoon FCP Project

START Date: 
January, 2012
END Date: 
September, 2016

Company: Shell Projects & Technologies (Royal Dutch Shell)

Designation: Senior Planning Engineer

 

Company profile: Shell is a global group of energy and petrochemicals companies with around 90,000 employees in more than 80 countries and territories

 

Major Projects:

 

·     Majnoon First commercial Production (FCP) Oil Project, Iraq: $1.5bln Majnoon development FCP Oil Green field EPIC Project consist of (100 kbopd) Central Processing Facility (CPF), export pipeline, Pig Launcher & Receiver Area, Four Gas Turbine Generator (GTG), Oil & Water storage tank, 15 new drilling wells connected to 3-Major Well pads. Also up-gradation of Brownfield facilities (120 kbopd) which includes two De-gassing stations (DS), 18 - Well pads, manifolds and associated flow lines. CPF facility construction includes 1,000,000 m2 area plot preparation & earthworks, Civil foundations, Substation & control room building, Chemical storage building, Fire station building, Loading Pump, Manifolds, Separator’s, HP/LP Flare , Pig Launcher and Receiver, Erection of Oil (1x15000m3) & water (2x5000m3) storage tanks (900 MT), 2000 MT structural steel & 4400 MT  Mechanical equipment erection (185 Equipments), 170000 Inch Dia piping welding and erection, 900 km of E&I cabling and 67 Km of export pipeline.

·     Majnoon First commercial Production (FCP) Gas Project, Iraq: $750mln Majnoon development FCP Gas EPIC Project is to capture and export 127MMSCFD of sweet gas to Power Station grid in Northern Iraq. FCP Gas facility consist of two Gas Turbine compressor trains, 100 Km Gas export pipeline, three Block valve stations (BVS), Launcher & Receiver area and Slug catcher facility, 200,000 m2 plot preparation & earthworks, Civil foundations, Pig Launcher & Receiver, Loading Pumps, Vessels, Substation building x 2 and Control Room , security building x 2, 200 MT structural steel & 1800 MT Mechanical equipment erection (120 Equipments), 40000 Inch Dia piping welding and erection, 250 km of E&I cabling and 100 Km of export pipeline.