Summary
To secure a challenging position that utilizes my professional education along with unique drive for excellence and success. Thrive to achieve laurels in the organisation by applying the technical know-how and managerial skills. Satisfying the appetite for knowledge in all fields has become the main goal in my professional career in the 9 year experience.
Professional Experience
Highlights of Technical (Mechanical Stream) Experience:
Major Erection / Installation of
•     210 MW TG’s
•     Boiler Feed Pumps
•     Various Other Pumps / Equipments in the Turbine Floor like the Governors, Oil Pumps, etc.
•     2 MW DG sets
•     Chemical Distribution Module, Gas Farms, UPW system
•     Transformers (66 KV, 2 MVA), Chillers 325 TR, 500MT Structural Works.
•     Piping / Ducting (SS316L, SS304, PPH, UPVC, FRP)
•     Semiconductor Process tools
•     2 MT Fish Net washing Equipment
Maintenance (Overhauling) Jobs handled
•     50 MW TG (Russian)
•     12 MW TG (Siemens)
•     8 MW TG (Siemens)
From May 2007 till date
TCE Consulting Engineers Ltd.,
Pune, India.
Project Manager - Tata BP Solar India Ltd., Expansion Projects, Bangalore
(March 2010 – till date)
Controls Manager - Tata BP Solar India Ltd., Expansion Projects, Bangalore
(May 2007 – March 2010)
Various projects handled:-
Current Project:-Solar Cell Manufacturing Lines (Four Lines) of more than 125MW
Module Expansion
Wet Safe
Module Relocation
     Quantity Survey at Taj SATS India, Catering Facility, Devenahalli Airport, Bangalore.
     Construction Safety Audit Compliance checks, Wipro Technologies, Electronics City, Bangalore
     Commissioning Assistance of HVAC system at Hotel ITC Gardenia, Bangalore
Principal Duties:
•     Strategic Location Analysis
•     Master Schedule preparation and control
•     Pre-Budget approvals and post Cost / CWIP control.
•     Documentation control and Project Close Out procedures.
•     Control of site works for utility & facility installations of over 50 major contracts.
•     Board strategy approval backup calculations for cost and time.
•     All project stage gate controls as per BP Standards.
•     Enforcing HSSE adherence as per BP standards.
•     Handling Claims from Insurance.
•     Process Improvement Study for Commercial Projects Department.
•     Driving Factor for Design Reviews, HAZOP (Hazards and Operability Study) reviews and PHSSEr (Project Health, Safety, Security and Environment review).
From February 2006 to Dec 2006
Consolidated Bearing Company Pty Ltd.,
Sales and Service Engineer
Adelaide Head Office, Australia.
Principal Duties:
•     Providing new product details to sales executives in product introduction meetings across the state.
•     Interaction with clients and providing them with new product details in regular intervals as recommendations.
•     Design & supply of Transmission System for a Two Ton Fish Net Washer.
•     Design & supply of Bearings for an existing production line to increase the life, with minimal adjustments to the production line and in regulation with FMCG requirements.
•     Scheduling and planning for overhauling of various clients according to their Maintenance requirement.
From July 2001 to December 2003
Power Mech Projects Pvt Ltd., Vijayawada, India.
Engineer In-charge at 2 X210 MW Thermal Power Plant Erection Site
(Neyveli, India)
Principal Duties:
     Handling of Individual projects which required leading a project team, monitoring expertise in assembly, testing and commissioning;
     Project Procurement & Planning;
     Billing and office procedures according to ISO;
     Implemented engineering level changes by coordinating with erection and commissioning team;
     Provided regular customer support by regular organized meetings with the clients regarding the progress of the projects;
     Overhauling of 5 and 12 MW thermal power plants at TNPL, Tamil Nadu, India, completed at a record time of 12 days instead of 25 days for each project.
     Overhauling of three units of 50 MW Thermal Power plant in N.L.C., with minimum required man power and prepared & adapted a new scheduling method for the project which is still in implementation.
Education Qualification
Certificate
(Project Management Techniques)     PMI
(Project Management Institute)     2009
Graduate Certificate
(Advanced Industrial & Manufacturing Management)     University of South Australia, Adeliade     2004 – 2006
B.E (Mechanical)     Annamalai University, India     1997 – 2001
CAD Skills – Working Knowledge in Uni-graphics, Pro-E, AutoCAD.
Hands on Experience - Microsoft Project, Primavera and MS Office
Highlights
     Project Management Techniques as per the standards of PMI and BP Global.
     Professional understanding of Technical and managerial concepts.
     Excellent working knowledge in engineering principles with hands on experience.
     Good Knowledge in TBEM Work Process methodology. “Silver Medal in Qualifying as an External Auditor in the TATA Group of Companies” (Tata Business Excellence Model is based on Malcom Balridge excellence model, USA).
     Continual Knowledge up-gradation of the technical aspects of the latest technology.
     Learning on the Job to ensure delivery as committed.
     Proven relationship-builder with positive attitude, good communication and presentation skills.
     Result-driven achiever and effective team leader with exceptional interpersonal skills.
     An active member of PMI (Project Management Institute).
     Have a valid First Aid Certificate.
General Information
Date of Birth          :     1 May 1980
Professional Since: 
Jul-2001 (22.8 yrs experience)
Oldest experience: 
Jul 2001 (22.8 yrs experience)
Years Experience: 
21

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.