Prateek Sanadhya
Prateek Sanadhya
“Vijayraj” Plot no. 2 Bajaj Nagar Enclave
Near Gandhi Nagar Railway Station,
Jaipur -302015 Rajasthan.
Mobile: (+91) 9001890039/9783073334/9414908811 (India)
E-mail: Prateeksanadhya22@yahoo.com
Skype ID : prateek220383
LinkedIn Profile : linkedin.com/in/prateek-sanadhya-653591112
Facebook Profile : facebook.com/prateek.sanadhya.18
_________________________________________________________________________________
Maximum Qualification: Post Graduate Diploma In Advance Construction Management, NICMAR
Graduation : Bachelor in Civil Engineering, Poona University
Career Objective: Lead a position in company, where my excellent managerial, analytical and technical skills can help company to take key decision which would improve company’s strategic position in future.
Career Summary:
- A Civil Engineer with almost 12.5 years of experience in project management, problem solving, assisting in designing business strategy and assisting in designing of business performance metrics for an organisation.
- Senior Manager, Planning in 32.5 Axle load long distance railway project “Khurja-Dadri” Eastern Dedicated Freight Corridor (512 Crs.) at Noida, Uttar Pradesh, India.
- Manager – Planning on Double Bituminous Surface Treatment (DBST) the length of 165 kms National Road 1 F Project IIPL Pte. Ltd. Singapore subsidiary of IL&FS Transportation Networks Limited, Vientiane ,Laos
- Manager-Technical in Road Infrastructure Development Company of Rajasthan subsidiary of IL&FS & Government of Rajasthan for State Road & Underground Parking Projects.
- Project Coordinator for 24 Madhya Pradesh Border check post of MPRDC, Bhopal Project cost (1300 Crs.).
- Planning Manager for NH-33 Harzaribag to Ranchi 4 Lane National Highway under NHAI Project cost (600 Crs.)
- Experienced project controls, planner and scheduler for DFCC Railways, Highways, Integrated Border Check post projects across India and high-rise commercial, residential buildings projects in Dubai.
- Possess the ability to understand the client and customer requirements and translate them into viable project structure to plan, monitor and assist risk of project.
- Training, motivate and guide planning engineer at site to successfully administer function of project controls at site.
- Provide effective leadership and motivate and guide team members towards maximum output and optimize productivity of available resources through efficient Resource Management.
- Assist ERP department to Implement Candy module in the organisation.
- Assist ERP department to implement planning, monitoring, budgeting and cost control system through Candy/Primavera/MSP.
- Assist in designing strategy frame work like balance scorecard for effective problem solving and decision making.
- Computer proficient MS-Office 2010 and MS-Project-2007/2010 & Primavera-Version P6.
Type Of Project Worked:
- 32.5 Axle load long distance railway
- 2 lane / 4 lane / 6 lane Highway Upgradation Project
- Residential Buildings.
- Commercial Buildings.
- Border Checkpost project
- Under Ground Car Parking Projects
- Testing & Commissioning.
- Interface Management
Key Skills:
Project Management
- Project Planning and Scheduling.
- Cost Planning and monitoring.
- Forensic Planning.
- Delay Analysis.
- Design Project execution methodology.
- Resource (Men, Machine, Material & Money) Planning and monitoring.
- Earned Value Analysis of Project.
Business Strategy
- Formulate strategy planning process.
- Formulate balanced scorecard.
- Evaluate critical success factor for organisation (CSF).
- Evaluate key performance indicator (KPI).
- SWOT (Strength, Weakness, Opportunity & Threat) analysis of business.
- Core Competence analysis.
- Value Chain Analysis.
___________________________________________________________________________
Education:
Degree | University | Institute | Year of Passing | Grade / Percentage |
PGDACM | Pune | National Institute of Construction Management & Research | Jan 2007 | 7.43 CGPA |
BE Civil | Pune | Bhartividya Peeth College of Engineering | May 2005 | 58 % (Higher Second Class) |
Project Finance | ICFAI, Pune | Certification Course in Project Financing (Infrastructure Projects) | 2006 | Pass |
Employment History :
From | To | Company / Project / Position / Relevant Technical and Management experience |
---|---|---|
01 Feb 2019 | Till Date | GMR – Tata Projects Joint Venture (GIL-TPL JV) Sr. Manager I Planning : Project : Design and Construction of Civil, Structures and Track Works, involving formation in Embankment/ Cutting, Ballast on formation, Track Works, Bridges, Structures, Buildings, Yards, Integration with Indian Railway’s existing Railway System and Testing and Commissioning on Design – Build Lump-Sum Basis of Dadri – Khurja Section (approximately 46.856 Route Km of UP & DN Line) of Eastern Dedicated Freight Corridor Project (Contract Package – 302) Client : Dedicated Freight Corridor Corporation of India Ltd. (DFCCIL)
|
Jul 2017
| Jan 2019
| IIPL Pte. Ltd. Singapore subsidiary of IL&FS Transportation Networks Limited
Project Co-ordinator/Manager -Planning:
Period : Jul 17 to Till date National Road 1 F Project : Construction of Double Bituminous Surface Treatment (DBST) the length of 165 kilometers, including 33 concrete bridges on Design and Build Method basis Period : June 17 to Jun 22 Project : National Road 1 F Project Scope :The scope covers the Design, Engineering, Finance, Procurement, Construction, and Operation & Maintenance of National Road 1 F Project in the Mahaxay District, Khammoun province to Phin district, Savannakhet Province, Lao People’ Democratic Republic on Design and Build Method basis of length of Km 164.837 Kms. Estimated Project Cost 165 Million Dollars, Duration : Concession Period 10 yrs(Construction Period 5yrs) Client : Ministry of Public Works Transport (MPWT) ,Laos PDR
|
Apr 2015 | Jun 2017
| Road Infrastructure Development Company of Rajasthan Limited (RIDCOR Ltd.) subsidiary of IL&FSTransportation Asso. Manager / Manager I Projects :
Project 1 : 2 Lanning with Paved Shoulder of Rawatsar-Nohar Badra State Highway Project on BOT basis in RIDCOR Phase III Packages under Public Works Dept. in State of Rajasthan (117.32 Km Length)
Project 2 : 2/4 Lanning with Paved Shoulder of Mathura Bharatpur Road State Highway Project on BOT basis in RIDCOR Phase III Packages under Public Works Dept. in State of Rajasthan (23.5 Km length)
Project 3 : Development of Parking Projects (Udaipur & Jodhpur) in State Of Rajasthan on EPC mode & Agency Charges basis Client : Public Works Department, Govt. of Rajasthan (Prj 1&2) & Urban Development and Housing Department of Government of Rajasthan (Prj3)
|
Apr 2011
| Mar 2015
| IL&FSTransportation Networks Limited Dy. Manager /Asso. Manager: Project : Construction, Up-Gradation & Modernization of 24 Border Check Posts in Madhya Pradesh on Build, Operate and Transfer (BOT) Basis Cost of Project: 1094 Crs. Concession Period : 4566 Days i.e. (12years & 6 months)including construction period) Construction Period :730 days (2 years) from Appointed Date Client : Madhya Pradesh Road Development Corporation (MPRDC)
|
Mar 2010
| Mar 2011
| IL&FSTransportation Networks Limited Dy. Manager: Project: 4 Lanning of Hazaribagh Ranchi National Highway Road NH-33 on Annuity Basis Project Length : 74.465 Kms Project Cost : 635.07 Crs. Concession Period : 18 Years (Including 2.5 Years Construction Period) Client : National Highway Authority of India (NHAI)
|
Nov 2009
| Mar 2010
| M/s Unity Infra Projects Ltd. Planning Manager Project: Six Laning of Gurgaon-Kotputli-Jaipur Section of NH-8 From Km. 144.770 To Km.181.300 In The State Of Rajasthan To Be Executed On BOT (Toll ) on DBFO Pattern Under NHDP Phase-V (Package-IV) Client : National Highway Authority of India (NHAI)
|
Mar 2007
| Aug 2009
| ETA –ASCON , Dubai Project 1:Twin towers 3B+G+P+C.C.+C.CM+28 floors Commercial & Residential building, UAE Client of Project 1:Emirates Financial Towers, DIFC, Dubai Project 2:3B+G+5 floors commercial & Residential building, UAE Client of Project 2:Al Nasr Sports Club ,Dubai Project 3 :3B+G+6P+34 floors commercial building, UAE Client of Project 3:Star Properties, Business Bay ,Dubai Prepare construction methodology and Clause 14 Baseline Schedule to meet contractual deadlines.
|
_________________________________________________________________________________
PG-ACM (NICMAR) Summer Internship:
Company Name : DS Construction, New Delhi.
Duration : Apr 2006- Jun 2006
Project Title : Project Management Application in Kundali-Manesar-Palwal Expressway
Engineering Training Project:
Company Name : Fortis Hospital, Jaipur.
Duration : Apr 2004-Jun 2004
Project Title : Use of Flat Slabs & Shear walls vs Conventional Construction Techniques
__________________________________________________________________________________
Professional Training attended:
Microsoft Project Planning (Primavera 6.0) : Zabeel Institute, Labour Ministry Dubai (2008)
Safety Hazards in Construction : Bureau Vetitas (2011)
ISO 14001:2004 & OHSAS 18001:2007 : TUV Rheinland (2012)
Safety Auditor : Centre Road Research Institute, Delhi (2017)
Construction Project Management Development Program: TATA Projects Ltd. Academy (2019)
_________________________________________________________________________________
Computer Skill:
- Microsoft Project Management (MSP), 2010.
- Primavera 6 (Hands-on)
- Candy v2.01
- AutoCAD
- Microsoft Office (Word, Power point, Excel)
- Tilos (beginner)
________________________________________________________________________________
Extra Curricula Activities: Singing, Dancing, Cricket
________________________________________________________________________________
Personal Details:
Date of Birth : 22nd March 1983
Marital Status : Married
Strength :
- Pro-Active approach
- Result Oriented
- True Catalyst
- High Achiever
- Persistent
- Motivator
- Curious to learn new things
Language : English, Hindi
__________________________________________________________________________________
Certification
Certification I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself along with qualification and work experience.
Dated: 09.08.2019 (Prateek Sanadhya)
- Industry:
- Region: