Prepared level-3 and level-4 (deliverables level) plan by P6 c/w histograms aligned with CTRs and SDS (Supplier Documents Schedule); monitored progress; and interfaced with Transfield Worley as construction contractor
Prepared level-3 and level-4 (deliverables level) plan by P6 c/w histograms aligned with CTRs and SDS (Supplier Documents Schedule); monitored progress; and interfaced with Transfield Worley as construction contractor
Links:
[1] http://www.planningplanet.com/category/project/alternative-bridge-landing-module-ablm-north-rankin-nra-platform
[2] http://www.planningplanet.com/category/skills/brown-field
[3] http://www.planningplanet.com/category/skills/engineering
[4] http://www.planningplanet.com/category/skills/histogram
[5] http://www.planningplanet.com/category/skills/interface
[6] http://www.planningplanet.com/category/skills/level-3-plan
[7] http://www.planningplanet.com/category/skills/level-4-plan
[8] http://www.planningplanet.com/taxonomy/term/7103
[9] http://www.planningplanet.com/category/skills/offshore
[10] http://www.planningplanet.com/category/industry/oil-gas-power
[11] http://www.planningplanet.com/category/skills/p6
[12] http://www.planningplanet.com/taxonomy/term/142
[13] http://www.planningplanet.com/taxonomy/term/12932
[14] http://www.planningplanet.com/category/skills/platform
[15] http://www.planningplanet.com/taxonomy/term/12812
[16] http://www.planningplanet.com/taxonomy/term/145
[17] http://www.planningplanet.com/category/region/oceana-pacific-oc/australia-ocau