I can't find field in Spider Project which would be analog of % Complete in MS Project. Who can help?
Does % Complete in Spider Project exist?
Forum Sponsor
Top Posters
anwar zeb
1 posts
olva seselima
1 posts
Muhammd Muneer
0 posts
sairam
0 posts
MARAT BILYALOV
0 posts
RichTea66
0 posts
Muneer Muhammad
1 posts
Manny Onifade
5 posts
Hunais M J
0 posts
Soheil Barekat
4 posts
Greetings Alex,
in Spider you can introduce what ever volumes you want for activities and also the specific unit of volume for these volumes. For example if you have an activity that cannot be measure quantitavely like writing a report you would use as volume a range between 1 and 100 with the unit of volume %, but if you have an activity like pouring 900 cubic meters of concrete you would introduce 900 in the volume column and m3 in the unit of volume column.
Regards,
Bogdan