bill of material

5 replies [Last post]
Syed Shahzad Huss...
User offline. Last seen 17 years 11 weeks ago. Offline
Joined: 31 Aug 2006
Posts: 6
SIR,

How we can enter Bill of Material in P3.

SHAH

Replies

Jose Frade
User offline. Last seen 3 years 7 weeks ago. Offline
Joined: 7 Jun 2005
Posts: 144
Groups: None
Just to ilustrate a little bit better my thinking:
PIPING - Normaly I never plan a deeper level then isometric:
So imagine an activity ISO Prefrabrication Line XXXXXX

Now the BOM
21,2 m Pipe seamless 10" P22 ASME 36.10
2 Un Elbow 10" LR BW P22
1 un Red Tee BW 10/6" P22
2.3 m Pipe Seamless 6" P22
1 Un Elbow 6" LR BW P22

And linking now with a FS the erection of this line with the following BOM

6 Supports type X 10 "
1 Valve 6" Globe kkkkkk
+ materials fabricated.

Question: What do U want to achieve with BOM’s ?
With this example about piping What would be the outcome beneficial for project planning?

Then note: U have this BOM once Detail design for piping is finished for a certain line. U need to have a plan for the project at the begin with just a litle of Basic design.

An example for steel structure would be even more worse with HEB profiles, xxx profiles, plates, bolts, nuts, etc.

Project planning # Work preparation # invoicing quantities even though they comunicate each other.

BR
JMFrade
ashraf alawady
User offline. Last seen 9 years 30 weeks ago. Offline
Joined: 27 Aug 2006
Posts: 320
Groups: None
Agreed, use the cost catagory.
Tariq Usman
User offline. Last seen 1 year 22 weeks ago. Offline
Joined: 14 Dec 2005
Posts: 15
Groups: None
hi shahzad,

you can do this by using the resource catagory where you will find all the options.

tariq

Jose Frade
User offline. Last seen 3 years 7 weeks ago. Offline
Joined: 7 Jun 2005
Posts: 144
Groups: None
Hello,

Depending on the discipline it can be quite a job to include it in P3 - also depending on the project size.

If referring to piping, Structural steel, Electrical, I&C, better to use a database (any) cause data manipulation will be enormeous that U will not have any time for the planning (revisions, field change notes, additionals, etc) - of course I’m thinking in Tones of piping, Kilometers of cables, hundreds 9at least) of instruments, valves etc - which U normaly have in Oil and gas works.

BR
JMFrade
Charleston-Joseph...
User offline. Last seen 2 years 39 weeks ago. Offline
Joined: 10 Jul 2005
Posts: 1347
Groups: None
Hi Syed,

You can enter this in the resource with cost categories materials. So for each activities you will assign the particular materials.