Senior Project Planner, Nam Fatt Construction Sdn Bhd, Various Project

START Date: 
April, 2007
END Date: 
March, 2008

Handling all planning & schedule aspect for all the infrastructure projects of the Company, which included (Pre‐tender – Level 1 & 2 Planning) presentation, methodology, preliminary schedule & resource allocation plan, (Post Contract) master work program, details work program support to project monitoring and progress status report, & etc…
Projects Involved: ‐
•     (Oil & Gas – Onshore / Offshore) Asian Petroleum Hub Project – The Engineering, Procurement, Construction and Commissioning of a Asia Petroleum Hup and Bunkering Facility at the Reclaimed Island at Tanjung Bin Johor
–     Package 4: Building And Infrastructure Works on Island (80 million)
–     Package 7: Road and Bridge (100 million)
–     Package: EPC Contract For Supply Base At Lot Ptd 3074, Mukim Tanjung Kupang For Pembangunan Pulau Tebus Guna Di Tanjung Kupang, Johor Sebagai Pusat Petroleum Dan Kemudahan Bunkering Untuk Aph Sdn Bhd (35 million)
–     Package: EPC Contract For Worker Valley At Lot Ptd 3075, Mukim Tanjung Kupang For Pembangunan Pulau Tebus Guna Di Tanjung Kupang, Johor Sebagai Pusat Petroleum Dan Kemudahan Bunkering Untuk Aph Sdn Bhd (5 million)
•     (High-rise Project) Proposed Substructure Works to Lot 64 Jalan Madge, Kuala Lumpur – Condominium (25 million)
•     (Factory Construction) Cadangan Mendirikan Sebuah Kilang Dengan Pejabat 2 Tingkat Di atas lot 29 (PT.121657), Jalan Sungai Pinang 4/8, Pulau Indah (KS13), Klang Bandar Diraja, Selangor Darul Ehsan. untuk tetuan Ara Rails Technology S/B (10 million)
•     (Factory Construction) JST Factory Sakigake in Port of Tanjung Pelepas for ‘J.S.T Connectors (Malaysia) Sdn Bdn’(60 Million)
•     (Government Project – Building and Infrastructure) Cadangan Cadangan Pembangunan Ibupejabat Polis Daerah Jembol Di Atas PT No. 948 Bandar Serting, Daerah Jempol, Negeri Sembilan Darul Khusus Untuk Tetuan ‘Polis Di Raja Malaysia’
Tender involved: ‐
•     (Airport Construction) New Tank Farm and Associated Fuelling Facilities at Malé International Airport for Maldives Airports Company Limited
•     (Infrastructure Works) Jambatan to Dua Sultan Yahya (Kelatan) ‐ Bridges Structure Works Muda River Water Scheme Phase 4A, Package 8 ‐ Clear Water Tank and High Lift Pumping Station
•     (Infrastructure Works) Package‐1: Sialkot‐Lahore Motorway from KM 0+000 to KM 87+750 Including Daska Bypass and Link to M‐2
•     (Infrastructure Works) The Proposed Construction And Completion Part Of Projek Lebuhraya Kemuning‐ Shah Alam (LKSA) – Package 1, 2 & 3
•     (Infrastructure Works) Proposed Shandara Flyover Project for National Highway Authority, Government of Pakistan (Negation Stage)
•     (Hospital Building) Proposed North Annexe & Ancillary Facilities at North Tower / OPC on Lot 4247 at No.1 Jalan SS 12/1A 47500 Subang Jaya Selangor Darul Ehsan
•     (Infrastructure & Utilities) Skim Bekalan Air Batu Hampar, Contract 4 – Construction and Completion of RC Service Reservoirs, Distribution Pipeline and Associated Works
•     (Infrastructure Works) Cadangan Kerja‐Kerja Infrastruktur Utama di Tapak Cadangan Pembangunan Skim Perumahan Taman LTAT Di Atas Sebahagian Lot PT 5321, 5322 Dan 5323, Bukit Jalil, Kuala Lumpur Untuk Lembaga Tabung Angatan Tentera
•     (Hotel & Resort Development) Proposed Addition and Alteration to Existing 6 Storey Hotel Development On Lot 18, 48, 49, 50, 309 & 337 at Sek 1, Bandat Batu Ferringhi, D.T.L. Pulau Pinang