Construction Project Planner / Senior Planner / Forensic Analyst, MPP-FGD, Maritsa East 2 FGD Units 1-4

START Date: 
August, 2006
END Date: 
October, 2009

- Upkeep of Master Erection and Baseline Schedules
- Multiple Recovery/Acceleration Schedule Options
- Multiple Critical Path Analysis
- Performance Monitoring
- Progress Monitoring, including S-Curves
- Forensic Claims Analysis
- Delay Event Recording
- Contract Change Control
- Correspondence Archive Monitoring
- Additional and Re-work Scheduling
- Client and Sub-contractor correspondence review

Building Designer, J A Jones International, NOB of the American Embassy in Sofia

START Date: 
May, 2003
END Date: 
November, 2004

Design-build teem member at the General Contractors office located in Sofia, Bulgaria. Responsible for preparation and coordination of structural shop drawings. Planning/scheduling/control, assisting subcontractors responsible for heating infrastructure, landscaping, road surfacing and road marking etc parts of the  New Office Building of the American Embassy in Sofia Project.

Forensic Planning and Delay Analysis, Taisei Corporation, Sofia Metro Extension Project

START Date: 
December, 2005
END Date: 
September, 2008

Extension of Sofia Metropolitan Project, as independent consultant together with Nielsen Wurster Group – USA, consulting TAISEI Corporation in schedule validation and update, variance, what-if and delay analyses, performance tracking, claims etc.

Planner, AES, 600 MW Coal Fired Power Plant - BULGARIA

START Date: 
September, 2008

Planner / Scheduler on a multi-billion huge EPC project for the construction of 600 MW Thermal Power Plant (including roads & infrastructure) and a Waste Disposal Facility with 4.5 km tube conveyor in Galabovo, Bulgaria. Tel. +359 886 445988

Kozloduy Nuclear Power Plant Planner

START Date: 
May, 1997
END Date: 
March, 2003
Working as a Maintenance planner of 4 nuclear reactors.

British Nuclear Group Planner

START Date: 
April, 2003
END Date: 
August, 2008
Working as a Planner/Scheduler on multi-million projects for decommissioning of nuclear facilities.

Planning Engineer - Senior, KAYI, Shopping Complex & Tender

START Date: 
November, 2008
  •         KAYI Construction, Sofia/ Bulgaria www.kayi.com.tr                    11.2008 –

Serdika Shopping Center & Offices, 210 000 m²

 

      Planning Engineer,

Fluor Intercontinental, Inc. dba J.A. Jones International Planner

START Date: 
April, 2003
END Date: 
May, 2005
US Embassy construction planning

Astaldi Arabia Ltd. Planner

START Date: 
May, 2008
Current Role

Market Place