MILITARY SERVICE Civil Engineer

START Date: 
September, 1994
END Date: 
April, 1995
Responsibilities:
•     Computer application in various works

DONATIM Civil Engineer

START Date: 
June, 1995
END Date: 
April, 1997
Project: Various Sales and marketing activities of various machinery, equipment
      and materials.

Responsibilities: (Reporting to Sales and Marketing Manager)
     Preparation of offers,
     Participating bids,
     Follow-up import formalities,
     Solving technical problems of the customers,

ZEYTAS Civil Engineer

START Date: 
May, 1997
END Date: 
August, 1997
Project: Various Sales and marketing activities for the construction chemicals and concrete additives.

Responsibilities: (Reporting to Technical Manager)
•     Supporting sales division by solving technical problems of the customers about the imported products, (special mortars, industrial flooring, coatings, etc.) for the construction industry,
•     Making the in-situ test, and laboratory tests ,

KAMER Civil Engineer

START Date: 
November, 2000
END Date: 
April, 2002
Project:
     Tekel Museum & Art, Exhibition Center Construction Project / Uskudar /      Pasalimani
     restoring the 200 years old stone masonry government building, newly combined with      steel framed construction replaced with the old slabs and converting into      “Museum and
     Art gallery” with full electronic control, retrofitting the parts having structural problems.

MESTAS Planner

START Date: 
June, 2002
END Date: 
March, 2003
Project:
A Steel Framed Structure, Turn key Industrial building construction with a tight schedule. Total area approx 10.000 sqm. The steel members have been made up of welded steel plates (not ready to use profiles) finished in 6 months Gebze/GEPOS. Total Contract value $5 M, Turn Key project.

Responsibilities: (reporting to the company owner)
     Managing site activities,
     Monitoring procurement activities,
     Preparation of construction work schedule by critical path analysis,

Tepe Planner

START Date: 
August, 2003
END Date: 
March, 2004
Project:
     BTC (Baku-Tibilisi-Ceyhan) Crude oil pipe-line const. project, PT2 pump station
construction, (BP funded project) Total contract price $98 M.

Responsibilities: (IN the head office, Reporting to Planning Manager, at site reporting to Project Manager)
•     Scheduling and schedule monitoring of all construction activities of the Pump station,
•     Preparation of daily, weekly and monthly construction progress reports, Look ahead schedules, dynamic scheduling,
•     Preparation of Interim Certificates,

1st mechanical Planner

START Date: 
December, 2008
Current Role

1st mechanical Planner

START Date: 
December, 2008
Current Role

IZOMAS KOROZYON KONTROL Civil Engineer

START Date: 
September, 1997
END Date: 
April, 1998
Project:
Structural / Seismic Retrofitting of the building of Yapi and Kredi Bank Gebze / Bayramoglu “Training Center” against expected earthquakes.

Responsibilities on site, reporting to Technical Manager:
•     Construction site controls,
•     preparation of design data,
•     on-site testing,
•     procurement,
•     Construction Schedule preparation, update and follow-up,

MAKIMSAN Civil Engineer

START Date: 
May, 1998
END Date: 
September, 1999
Project:
     Rehabilitation (re-design and construction) of existing 2 lane highway between Ankara –
     Samsun, approximately. 100 Km. The client: General Directory of State Highways.
     
     Responsibilities: (Reporting to Site Manager)
     Redesigning the highway by changing the alignments and rebuilding the sub grades and layers by using software Net CAD and NetPRO,