Chemical complex shutdown and most equipment sold overseas, natural gas contract lost and pricing made the operations unprofitable. Worked way up through operations from an āEā operator to an āAā operator and was promoted to Production Shift Supervisor in 1982 during the startup of the PACE (pool chemical plant).