Project Engineer, Pan Engineering, Industrial Building Construction

START Date: 
April, 2007
END Date: 
July, 1996

Projects Site Engineer, Scheduler     

M+W Group, Singapore.

 

From-  Nov’ 2005

To- April 2007

 

·        Supported and promoted the Health and Safety Program to meet the organizations objectives

·        Demonstrated scope accountability to the project teams in fulfilling the company and contractual objectives with respect to planning and scheduling

·        Maintained master plan  / schedule for each project and identified the impact of work performed and not performed as scheduled

·        Evaluated actual  construction progress and provided regular schedule updates

·        Interfaced with operations, owners, suppliers and subcontractors to discuss  impact of work and resolution of problems

·        Extracted and summarized relevant contract requirements from the contract documents as it related to the project schedule contractual start and end dates, key  milestone dates, owner involvement and liquidated damage and special  clauses.

·        Evaluated the estimated cost reports to support the project’s control objectives and contractual requirements.

·        Fully  cost loaded  the schedule and created schedule of value  using  proper weight distribution

·        Prepared project RFI's and EWOs and followed the shop drawings and IFC process

·        Ensured that signed  contracts are communicated to all relevant parties to provide contract visibility and awareness, interpretation to support implementation

·        Quality Collaborated with the Project team to ensure all project work and the company policies  and procedures are completed as per the control documents and the company’s standards.

·        Formed project resource histogram and assign  fairly leveled resources to the project activities

·        Submitted production budget estimates and set up on the WBS level  with different PFs

·        Monitored and maintained the project schedule updates on a bi-weekly bases

·        Created project milestones schedule and the master model  for client review

·        Created cost control account and assigned cost to schedule activities.

 

Project Synopsis: Construction, Architecture, M&E work, T&C, TOP, Handover of Facilities to Client.

- IM Flash, Project - Admiralty Road.

 

Engineer- Maintenance

YMC Marine Pte ltd, Singapore.

 

From-  July’ 2003

To- Aug’ 2005

 

·        Arrangement and in-charge of, Overhauling and Reporting condition of below list of equipments.

·        Hydraulic pumps, Hydraulic Motors, and Control Valves.

·        Also Overhauling of Pneumatic Equipments, Compressors, and Blowers. All types of Valves, Heat Exchangers, Condensers, marine pumps, Engines of Outboard Motors.

·        Keep Clients List maintain, Planning and Scheduling Routine Maintenance, Repair & Reconditioning Works.

 

 

 

 

Engineer

Indtech Engineers(India) Pte Ltd, India.

 

 

From-  July’ 1996

To- June’ 2003

·        Preparation of Daily & Monthly Power Generation reports which includes Fuel, Water, Chemical, Aux. Load consumption & Export Power details.

·        Monitoring & Comparison of the achievements with the Targets.

·        Preparing preventive maintenance schedules to reduce the plant shutdowns & improving efficiency.

·        Assisted project manager in coordinating works between sub-contractors, supervisors and tendering. Experiences gained in coordination works, planning, construction, safety supervision, design works, project management and tender submissions.

 

 

Project Synopsis: Erection, Commissioning, Operation and Maintenance of Cogen based power plant (16.2 MW).

 

 

Additional Experience on project:

  • Responsible for preparation of product technical specifications and bid packages for tender purposes
  • Coordinate with customers, vendors and regulatory bodies on engineering Project execution
  • Prepare technical drawings and specifications for construction purposes
  • Responsible for construction supervision and field commissioning of Project/process system complete with all interfaces, measurement points and management
  • Providing expert technical support and resolving technical issues on site
  • Handle responsibilities of developing and implementing high level control strategies for Process Equipment in manufacturing industries.
  • Assigned the tasks of developing and maintaining Planning control models.
  • Perform responsibilities of reviewing the Plan, status and issues of effective control planning systems
  • Assigned responsibilities of providing project control system and process engineering expertise for Oil &Gas controls systems
  • Perform the tasks of Planning, Execution, implementing and supporting Plant manufacturing and test equipment
  • Handle the tasks of educating in-house field technicians on site and contractors.
  • Adhere with Quality Management System and Safety is my First priority.
Experience Hours (Planning & Scheduling): 
3000
Experience Hours (Cost Management): 
3000