Systems Planner, Tiffany Contractors, Tiffany Field Development

START Date: 
September, 1990
END Date: 
March, 1993

Based at the construction site on the fabrication, testing and commissioning of four modules totalling 23,000 tonnes and reporting to the Senior Site Planning Engineer, responsibilities were for the development and maintenance of the project construction planning system on the P.C. based Artemis 7000 System.

Duties included the systems development and updating of construction networks and the preparation of schedule analyses and progress reports. Establishing and maintaining a construction database of in excess of 1.5m records to control the design/construction interface, materials/construction interface, construction/testing/commissioning interface and construction work availability. The role also included updating the progress measurement system and producing progress statistics at four levels of detail, maintaining the engineering holds database and preparation of database reports and schedules related graphics.