Executive Production And QC, pyramid building systems pvt ltd., Pre Engineering Building
START Date:
October, 2010
END Date:
October, 2013 1. Designated manpower for particular projects.
2. Planned and oversaw entire program.
3. Ensured that structure’s member production cycle is safe and that structure member’s are completed safely and in accordance with the specified standards of welding and dimension.
4. Specified the time and elements of structure’s member’s dispatch.
5. Routing the processes and sub-processes to minimize the ideal time & maximum utilization of all resources.
6. Execution and Continuous monitoring of all the processes accordance with scheduling to meet targets.
- Company:
- Industry:
- Job Role:
- Project:
- Region: