Project Cost Control/Planning, SICIM SpA, All EPC and I project both offshore and onshore.

START Date: 
June, 2000

2012 to present   I have worked with SICIM S.p.A, Kazakhstan Branch. as a Project Planner & scheduler
                          Project Reference

                          1. Water Injection System Upgread

                          2. 12" and 18" Trunkline Debottlennecting Project    

                          3. Wellhead Flowline and Hook up

2011 to 2012       I had worked with CUEL Ltd. Bangkok, Thailan. as a Project Planner & scheduler
                          Project Reference                                  

                         1. Chevron Project Phase 39, 41 adn 42. Total 15 platforms, 1 HUB platform and 

                             associated  31 pipelines                  

2009 to 2011      I had worked with CUEL Ltd. Bangkok, Thailan as a Senior Cost Controller

                         Project Reference   

                         1. Arthit 1C Project: 4 Wellhead Platforms, 4 Associated pipelines and 3 Browfields.

                             Owner: PTT Expolartion and Production Public Co., Ltd.

                         2. Essar D1 Project: 3 Jackets

                             Owner: Essar Offshor Subsea Limited

                         3. Suriya B Project: 1 Wellhead Platforms, 2 Brownfield.

                             Owner: Carigali Hess Operating Comapny Sdn Bhd.

                         4. BG-Hydra Project: 2 Wellhead Platforms

                             Owner: Swiber Offshor Construcjtion Pte., Ltd.

2003 to 2008      I had worked with Grand Builder Co., Ltd., Bangkok, Thailan as an asst. Estimator & Cost Controller             

                         Project Reference  

                         1. Superstore 14 Unit

                         2. Factory 3 Unit

                         3. Power Plan (55 MW) 1 Unit

                         4. Wast Water Treatment Plant 1 Unit

                         5. Biogas Plant 1 Unit

2000 to 2003      I had graduated in 2000 and start work as Teacher Assistant (Civil Engineering Program) at Sirindhorn International Institute