Claims Analyst, Planner & Various other roles as contracts dictate, Self / Contract Employed, Various (See below)

START Date: 
June, 1996

WORK & Project HISTORY:  1996to Date (by Sector)

 

  • COMPLEX SPREADSHEET SOLUTIONS (Unique – Irrespective of Project):
 

2012:  Consultant / Provide Spreadsheet Solutions to DRIVER TRETT - To enable extraction of information from circa 100 individual spreadsheets in a simplified and understandable manner in order to compile associated claim

 

2011:  Consultant / Provide Spreadsheet Solutions to ENTERPRISE UTILITIES - To extract, handle, calculate and summarise data from and  return  findings to approx 93 individual spreadsheets associated with an EPC contract & further maintenance valued in the region of £80m+

 

  • INFRASTRUCTURE:
    • TRANSPORTATION:
      • RAIL:

 

2010:  Provision of Tender Programmes for framework projects including Southend-on-Sea (£2.5m) continuing on to live progress reporting etc; Victoria Gateway & Deeping Closure; Progress Road; Cuckoo Corner:  Carillion

 

2009:  Delay Analysis & prep of Advisory / Independent Review Documents for the client: Snowhill Railway Station Secondary Entrance, Birmingham:  NR v Ed Nuttall Ltd

 

2007:  Network Rail Ltd (Employer):  Assist in the preparation of contract documents ICE 7th for the Airdrie to Bathgate rail scheme of value £300 million (Scott Rail Glasgow)

 

2005:  P3/Excel Programme Analyst:  Littlehampton ~ Amec / Systech

 

2001-2002:  Management/Claims presentation ~ CTRL Stratford (Vent Shafts valued at £25m) 4D modelling against programme to show different types, options & methods of design/construction (Conventional v Slipform)

 

2001:  Delay/Claims Analyst:  Channel Tunnel Rail Links (CTRL) under NEC3~ Kvaerner (Ashford, Kent)

 

1996-1999:  Assist in Delay/Claims Analyst & Sub-Contract Accounts: Stratford Stn Redevelopment - JLEP ~ Kvaerner

 

1998:  Tender:  D&B BoQ submission for Copenhagen Mini-metro ~ E Nuttall

 

1998:  Rail Maintenance: Assist in the assembling contractual terms etc for a Partnership proposals offered between Contractor & Client

 

  • MOTORWAYS & ROADS:

 

2009:  Prepare Delay Analysis & Claims Document: Slough High Street Pedestrianisation:  Enterprise v Slough Borough Council together with London Road, Improvement Scheme, Headington, Oxford:  Enterprise v Oxfordshire County Council

 

2009:  Delay Analysis & prep of Claim Documents in connection with the Guildhall, London:  Bovis Lend Lease

 

2008:  RNCMNR (Ministry of Transport Romania):  Assist and support Expert in FIDIC Dispute Adjudication Board (DAB) for €13 million prolongation claim at Proodeftiki.

 

2008:  RNCMNR (Ministry of Transport Romania):  Assist and support Expert Witness in FIDIC Dispute Adjudication Board (DAB) for €5 million claim on road rehabilitation scheme at Pantechniki, Romania.

 

2007:  RNCMNR (Ministry of Transport Romania):  Assist and support Expert Witness in FIDIC Dispute Adjudication Board (DAB) for €18 million extension of time (EoT) claim with costs on road rehabilitation scheme knows as 4R13

 

2007:  Colas (Contractor):  Assist in the preparation and submission of a claim for €23 million of prolongation costs for road rehabilitation in Romania (FIDIC Conditions of Contract).

 

2006-2008: RNCMNR (Ministry of Transport Romania):  Assist and support Expert Witness in Delay Analysis to calculate interim extension of time and prolongation claim of €23 million for 150km of motorway construction (FIDIC Conditions of Contract)

 

2006-2008:  Romanian National Company of Motorways and National Roads (RNCMNR) (Ministry of Transport Romania):  Assist and support Expert Witness in Delay Analysis to calculate interim extension of time and prolongation claim of €30 million for 23km of motorway construction (FIDIC Conditions of Contract)

 

2001:  Assist in the Tender of:  A422 Hennef Way Dualling ~ Norwest Holst

 

1992-1993: Deputy Resident Engineer on Sleaford By-Pass – New Construction including various junctions, bridges & culverts

 

1991-1992: Resident Engineer on John Adams Way, Boston – Road Improvement Scheme incl associated traffic management

 

  • AIR/AIRPORTS:

 

1996:  Delay/Claims Analyst:  Assist in the preparation of a claim on works being carried out at RAF Lakenheath;

 

  • UTILITIES:
    • WATER:

 

2010:  Claims / Delay Analyst / Forensic Planner:  B&H Water Treatment Works 4D Brighton

 

  • ELECTRICITY:

 

2010:  Tender programme(s) & schedule of rates for various (9 in total) electrical  maintenance & upgrade schemes:  Utilities ~ Enterprise Utilities

 

2010:  Tender programme(s) & schedule of rates (& associated spreadsheet solutions) for various (11 in total) substation improvement schemes through the UK:  Utilities Enterprise Utilities (Total Value £8.5m)

 

  • CIVIL ENGINEERING (where not included elsewhere):
    • BRIDGES:

 

1994-1995:  Project Manager ~ Grantham Rail Bridge Refurbishment for Local Government Contractor

 

  • TUNNELING:
 

2000:  Marketing & Tender of works for Specialist Tunnelling Contractor.

 

  • BUILDING / PROPERTY:
    • COMMERCIAL:

 

2006:  Delay/Claims Analyst: St Alban’s Housing Refurbishment ~ ****

 

2005-2007:  MJ Gleeson v GE Frankona (Client): Assist in the assessment and response to a £2 million claim for damages associated with remedial works caused by dry rot during the conversion to and refurbishment of flats.

 

2004-2005:  Delay/Claims Analyst + Accounts:  for extension of time claim associated with building services work at the new Wembley National Stadium, London, UK.

 

2004:  Delay/Claims Analyst: £15m Claim ~ Yarm Road & Cleveland Bridge -v- Hewden Tower Cranes Limited ~ Hewden Cranes Limited

 

2002-2004:  Delay/Claims Analyst for claims for extension of time and loss and expense incurred in the construction of Triton Square & Atlantic House, Holborn, London, UK ~ Skanska

 

2002:  Project Management on the Swiss Re Development (New London HQ – The Gerkin) ~ Skanska

 

2001-2002:  Delay/Claims Analyst:  Harrods Crown Court  Redevelopment ~ Kvaerner

 

2001:  Claims including Multimedia Presentations: ‘The Gate’ (Grade I Listed Bldg) ~ Skanska

 

  • EDUCATION:

 

2005:  QS / Commercial Support:  Nottingham Beeston College ~ Jarvis Construction / Systech

 

  • HEALTH:

 

2005-2007Assist in the preparation and submission of a £20 million claim for delay and disruption to the regular progress of the works at Coventry Hospital:  Skanska Coventry Joint Venture (Contractor)

 

2003:  Delay/Claims Analyst & S/C Accounts Analysis: Long Grove Hospital ~ NBA International Ltd / Bluestone

 

2003:  Assisting with Tender rates and schedules & phasing of works etc:  Barts & London  Hospital ~ Skanska

 

  • RETAIL:

 

2004:  Delay/Claims Analyst: Wetherby New Build ~ Holroyd Construction

 

2004:  Delay/Claims Analyst: Wakefield Building Refurbishment ~ Holroyd Construction

 

2004:  Delay/Claims Analyst: Fulham Island Building Reconstruction and Refurbishment ~ Arbitration CZWG

 

  • ENERGY:
    • OIL & GAS / WATER TECHNOLOGY:

 

2017-2018 Veolia STI BU – Project in Finland (KPP / NJ) Claim schedule for EOT

 

2017:  Korea (KNPC) Claim narrative & schedule for EOT through Delay & Disruption;

 

2016-2018:  Jazan IGCC (EP): Biological, Oily Water & Metal Removal Treatment Packages, Saudi Arabia (Value: $60m) – including Claim for EOT & associated costs

 

2016:  Saudi Arabia (BP Kazzan) for Middle East BU – Claim for EOT & Associated costs resulting from delay & disruption

 

2014-2016:  SHELL Carmon Creek Project - New Oil Production Facility, Peace River, Alberta, Canada (Value: $435m) – Lead planner between 4 different BU’s around the world

 

2015-2016:  ECOPetrol, Columbia:  Djeno Feed Study &  Karbala Refinery (Value: $70m)

 

2015:  Planner:  Tender & live schedule / reporting for the BP West Nile Delta Project (E) - Onshore Facility (Value: $4m)…  early termination.

 

2014-2015:  Planner:  Tender & live schedule / reporting for Tatweer I & III (WWTP TB 2, 3, 4, 1, 5 & 6) (EPC) – Bahrain (incl Claim(s) for EoT) (Value: $55m)

 

2014-2015:  Planner:  Tender & live schedule / reporting for Tatweer New Tank Battery (NTB) (EPC) – Bahrain (Value: $15m)

 

2014:  Planner:  Tender for Iraq West Qurna I (Tender)

 

2014:  Planner:  Tender for SONARA Camaroon (draft for negotiations)

 

2013:  Planner:  Tender for Qatar Petroleum (draft for negotiations)

 

2011-2013:  Planner:  Tender & live planning / reporting for RMP2 Petron Daelim WWTP – Philippines (Value: $25m)

 

2008:  Romanian Ministry of Finance (Employer):  Assist Expert advisor in a FIDIC DAB for €13 million prolongation claim on Timisoara Waste Water Treatment Plant.

 

2006-2007:  Veolia Environmental (Contractor):  Assist in the preparation and submission of €30 million claim of Compensation Events that have caused delay and disruption to the construction of a water treatment works in Secunda, South Africa. (NEC Option B)

 

2006:  Delay/Claims Analyst: Isle of Grain ~ Skanska

 

2011-2017: Numerous Oil & Gas (Water Tech) Tenders on behalf of Veolia, Paris

 

  • NUCLEAR:

 

2004:  Tender/Programmer: £30m Nuclear Low Level Waste Prog. ~ Skanska Cementation.

 

  • NATURAL RESOURCES:
    • MINING & METALS:

 

2008:  Metinvest – Ukraine (Employer):  Programme/Contracts Manager preparing P6 programme in association with NEC3 contract documents for procurement and management of contractors for the construction / extension of 3 iron and steel factories valued at €13 billion.

 

2008:  VAI – Defurco Contract:  Delay Programme Presentation detailing Effected Works within Possession / Close Down Period of Steel Works

 

2000-2003:  Delay/Claims Analyst:  CST – Hot Strip Mill, Brazil ~ VAI (UK) ltd valued at £280m