  • Signature Building, Titanic Quarter, Belfats, Northern Ireland. I provided detailed planning and programming advice and produced the detailed construction programme for this flagship project,
  • London Eye, Capsule Upgrade. It was my job to produce, develop and montor the detailed design, manufacture and refurbishment programmes for the refurbishment / upgrading of the viewing capsules on the London Eye,
  • Yas Island Retail, Abu Dhabi, UAE. The development and management of design release pogrammes with the various concept and detailed design consultants. Integration of the design release process with the procurement and construction programmes.