Site Planner, Al Bassami Group, Salman Bay Infrastructure Project

START Date: 
June, 2007

 

PROFESSIONAL WORK HISTORY

Company: Al-Bassami Group

Head Office

 (January 2012 – October 2012)

-          Technical Head

·         Compiling of All Report to all Projects

·         Approval of Quantity Delivered in Site

·         Summary of Progress in all Projects

·         Data Gathering in all Project

 

Company: Al-Bassami Group

Projects:

-          Talah Garden City Phase 1-Infrastructure (EMAAR – King Abdullah Economic City, Saudi Arabia)

-          Alfareeda Residential Community Project Zone 1, 2, 3 and 4 – Infrastructure (Dhaban, Saudi Arabia)

-          Government Office Building in Al Lith and Adom, Saudi Arabia

-          Roads and Shore Development in Al Shawaq, Saudi Arabia

-          Infrastructure in Yanbu, Saudi Arabia

-          Infrastructure in Al Madina, Saudi Arabia

 

 

 

 

(January 2012 – Present)

-          Planner/Scheduler

·         Baseline Schedule

·         Procurement, Manpower and Equipment Plan

·         Daily Report / Weekly Report / Monthly Report

·         2 weeks Look Ahead

·         Recovery/Revise Plan

·         Updating the Schedule

 

Company: MGS Construction

Project: Starmall Bulacan(San Jose Del Monte, Bulacan )

(April 2011January 2012)

-          Project Engineer (Structural and Architectural)

·         Site supervisor

·         Rebar Engineer

·         QA/QC

-          Quantity Surveyor (Structural )

·         Estimate Quantity (Rebars)

-          Office Engineer (Structural )

·         Documentation

·         AutoCAD

·         Cutting list

 

 

Company: MGS Construction

Project: Presidio-Renoir 10-Storey Condominium Building (Sucat, Muntinlupa City)

(February 2009 – April 2011)

-          Project Engineer (Structural and Architectural)

·         Site supervisor

·         Formwork Engineer

·         Concreting Engineer

·         Rebar Engineer

·         QA/QC

·         Detailer

-          Quantity Surveyor (Structural and Architectural)

·         Estimate Quantity (All materials both Structural and Architectural)

·         Productivity Report

-          Office Engineer (Structural and Architectural)

·         Documentation

·         AutoCAD

·         Scheduler

 

Company: MGS Construction                                                                                                              

Project: Lessandra Subdivision, Land Development and Culvert (Molino, Cavite )

(September 2009 – December 2009)

-          Project Engineer (Structural)

·         Site supervisor

·         Surveyor

·         Plumbing works

·         QA/QC

·         Detailer

 

 

-          Quantity Surveyor (Structural)

·         Estimate Quantity (All materials both Structural and Architectural)

·         Productivity Report

-          Office Engineer (Structural)

·         Documentation

·         AutoCAD

·         Scheduler

 

 

 

 

 

Company: MGS Construction

Project: Presidio-Bellini, 5-Storey Condominium Building (Sucat, Muntinlupa City)

(September 2008 – February 2009)

-          Project Engineer (Structural and Architectural)

·         Site Supervisor

·         Formwork Engineer

·         Concreting Engineer

·         QA/QC

·         Detailer

-          Quantity Surveyor (Structural and Architectural)

·         Estimate Quantity (All Material both Structural and Architectural)

·         Productivity Report

-          Office Engineer (Structural and Architectural)

·         Documentation

·         AutoCAD

·         Scheduler

 

 

Company: JVRL Construction

Project: ASYA 2 Boracay Resort, 10 units 2-Storey Residential House (Boracay Island, Malay, Aklan) (March 2008 – August 2008)

-          Project Engineer (Structural)

·         Site Supervision

·         Formwork Engineer

·         Concreting Engineer

·         Rebar Engineer

·         QA/QC

-          Quantity Surveyor (Structural)

·         Preparing Billing

·         Quantifying the accomplished work

·         Estimating of Cost and Quantity 

-          Office Engineer (Structural)

·         Documentation

·         AutoCAD

·         Scheduler

 

 

Company: DATEM Incorporated

Project: St. Luke’s Medical Center (Fort Bonifacio Global City, Taguig City)

(May 2007 – March 2008)

-          Project Engineer

·         Preparing Cutting List using Autocadd

·         Rebar Engineer

·         Concreting Engineer

·         QA/QC (Rebar and Concreting)

-          Quantity Surveyor

·         Rehashed Estimating of Rebar

·         Estimating of Pouring of Concrete Area

-          Office Engineer

·         AutoCad

·         Ordering/Batching Concrete

·         Cutting list for Rebar