Planning Engineer, Descon Engineering Limited, Pakistan, Rehabilitation & Modernization of Jinnah Barrage

START Date: 
February, 2008

Company: Descon Engineering Limited Pakistan. 
Position: Planning Engineer 

Project: Rehabilitation & Modenization of Jinnah Barrage

Duration: May 2011 to date

Responsibilities:
Job responsibilities include but are not limited to:

? Dealing with client, preparing master plan using Primavera Project Management-P3.
? Update progress, preparing weekly and monthly reports.
? Prepare look ahead schedules, analyzing the delays & suggesting corrective actions to higher management.
? Load resources to schedule, preparing man power and resource histograms, preparing 
S-Curve.
? Assign schedules to sub-contractors & reviewing sub contractor’s schedules and reports.
? Prepare reports for daily progress for its proper monitoring and controlling.
? Prepare weekly progress report and its backup sheets for client’s verifications and update Master schedule

Company: Descon Engineering Abudhabi (U.nited Arab Emirates) 

Position: Planning Engineer 
Duration: May 2011 to December 2012

Responsibilities:
Job responsibilities include but are not limited to:

? Responsible for Material procurement & Documentation of necessary data.
? Inventory and TSF management.
? Planning of TSF work on Primavera and progress monitoring of TSF.
? Dealing with client, preparing master plan using Primavera Project Management-P3.
? Update progress, preparing weekly and monthly reports.
? Prepare look ahead schedules, analyzing the delays & suggesting corrective actions to higher management.
? Load resources to schedule, preparing man power and resource histograms, preparing 
S-Curve.
? Assign schedules to sub-contractors & reviewing sub contractor’s schedules and reports.
? Prepare reports for daily progress for its proper monitoring and controlling.
? Prepare weekly progress report and its backup sheets for client’s verifications and update Master schedule

Company: Gulf Engineering Services (Pvt.) Ltd. 
Position: Planning Engineer 
Duration: November 2009 to April 2011

Annual Outage (Shutdown) of 586MW Uch Combined Cycle Gas power station, Dera Murad Jamali (Baluchistan)
From 25 October 2010 to 12 November 2010
Activities:
? Expansion joint removal & installation of new expansion joint with insulation pillows
? Removal of old filters, Cleaning of Gas Turbines filter houses, filters cages alignment and installation of new filters
? Commissioning of Gas Turbines filter house.

Responsibilities:
? Planning of Uch Power Plant Limited Annual shutdown on Primavera & also with the help of Gantt chart and progress controlling of Shutdown.
? Planning, Scheduling, Progress Monitoring, Estimation & Execution of Construction activities for Piping, Steel Structure & equipments on different Shutdown & Projects.
? Planning & Progress monitoring by preparing Daily & Weekly Progress report on different sites.
? Office documentation of different running projects and sites
? Preparation of Invoices & Change Order claims for Fabrication & Construction work
? Maintenance of rotary & stationary Equipments like Cooling water pumps, close cycle cooling water pumps & Air inlet filters.
? Supervision of Site Fabrication & erection work as per requirement.

 

Company: Group One Engineering (LTD.) HFZC Sharjah.UAE
Project Detail: AJWA Air Separation Plant, Shadeed Steel Mill Site, Sohar, Oman
Client: & Abdullah Hashim Group (KSA) 
Position: Project Control Engineer for Construction of AJWA Gas Project 
Duration: December 2007 to September 2009

My main experience is construction of AJWA Air Separation Plant, Shadeed Steel Mill Site, Sohar, Oman. The main products of plant are Oxygen and Nitrogen Gases @2x240 ton per day. I worked as Project Engineer for Planning, Fabrication & Erection of Piping, Steel Structure, Rotary & Stationary equipments. Project was successfully completed with compliance of international QA/QC & HSE standards.

Responsibilities:

? Planning, Scheduling, Progress Monitoring & Execution of Construction activities for Piping, Steel Structure & equipments.
? Update progress, preparing daily, weekly and monthly reports.
? Planning & Progress monitoring by preparing Daily & Weekly Progress reports from different sites.
? Progress monitoring by preparing Daily, Weekly & Monthly Progress report and updating Plan.
? Calculate the BOQ of piping & fittings from isometrics and compare with client BOQ.
? Preparation of BOQ of Pipe Supports & Structure Material.
? Ensure control & distribution of updated versions of drawings, specifications, obsolete documents and that all activities at site are carried out on latest revisions.
? Responsible to raise and follow-up Technical Queries with coordination of Project Manager.
? Responsible for managing Radiography of required joints and maintaining the record.
? Responsible for Material procurement & Documentation of necessary data.
? Trace out all the piping from the piping plans.
? Compare the specifications of Purchase Order with the specifications of BOQ.
? Follow-up the vendor after issuance of PO.
? To take-up the queries raised from vendors.
? Document control of all Piping during fabrication & erection
? Preparation of Invoices, Change Order and extra work claims for Fabrication & Construction (Civil, Mechanical, E&I) work.
? Erection of LIN & LOX Storage Tanks, Cold Box, TSA Skid according to Plan Drawing.
? Erection of Molecular Sieve Vessel, DCAC Vessel, Chiller Tower & Buffer Vessel.
? Erection of Main Air Compressor & Booster Air Compressor.
? Erection of LOX Vaporizers & LIN Vaporizers
? Fabrication & erection work for piping & equipments.
? Fabrication of Pipe Supports & Structure Material.
? Fabrication & erection of structure work like pipe racks, Pipe Bridge, platform with railing & monkey ladder and all the heavy structure with base plates grouted.
? Erection of Shed on different structures on site.
? Document control during fabrication of final piping with equipments in Site.
? Progress monitoring by preparing Daily, Weekly & Monthly Progress report and updating Plan.
? Calculation of AS BUILT BOQ for the Change Orders and compare with the client BOQ
? Punch list killing of all piping, structure and supports by area wise.
? Chemical cleaning of piping & Sand blasting of pipes and structure.
? Painting of all areas according to client requirement.
? Radiography of spools according to client requirement.
? Pressure testing (Pneumatic testing) of required loops.
? Insulation of required pipelines & equipments
? Fencing of the Plant, Plant Handover & Demobilization

COMPUTER SKILLS
• Primavera Project Planner P3
• Microsoft Office (Word, Excel, Power Point, Access)
• Microsoft Operating System (Windows 98,2000,XP)
• User Level knowledge of Internet
 

CO-CURRICULAR ACTIVITIES

• Member Debating Society U.E.T Lahore
• Member Blood Donors Society U.E.T Lahore
• Book reading, Badminton playing

LANGUAGES
• English with complete command
• Urdu with complete command
• Arabic with complete command
• Punjabi with fluency

PERSONAL INFORMATION
• Father’s Name: Rab Nawaz
• N.I.C No: 32***-***-****-1
• Passport: FW514403
• Religion: Islam
• Marital Status : Married