PROJECT ENGINEER / MECHANICAL ENGINEER, Ponticelli Nigeria Limited, REVAMP & CONSTRUCTION OF OIL & GAS FACILITIES

START Date: 
July, 2003

 

EMPLOYMENT

 

Project Engineer                                                                                            (July 2009-Date)

Ponticelli Nigeria Limited

  • Coordinating with HSE section with client rep. for a JHA of work activity.
  • Coordinating the daily signing and revalidation of permit to work (PTW).
  • Supervision of servicing and maintenance of level switches & controllers, cleaning of floaters, etc
  • Supervision of servicing of pressure switches.
  • Supervision of installation of cams, connectors, tubing layout, etc.
  • Supervision of the installation of booster pumps for process water lines.
  • Supervision of the installation of ABB electrical panel and the termination of associated cables in the control room.
  • Supervision of painting of process vessels (flash tank, API Skimmer, Flotator), tanks (Foam Recovery unit), lines and associated valves.
  • Supervision of erection of scaffoldings for painting and installation works.
  • Full participation at client/contractor meetings and update of progress status of work progress.
  • Supervision of flushing of water/oil drain lines and spading of access valves to commence welding of tie-in point.
  • Supervision of mechanical cleaning of vessel, painting, spool modification on Atmospheric Test Separator (ATM, HP, LP, MP, TEST).
  • Review of P&ID drawings and Isometric drawings.
  • Supervision of workshop fabrication and site installation of fabricated spools.
  • Coordinating with the AutoCAD engineers and draftsmen on P&ID’s & Isometric drawings.
  • Development of method statement for technical tender.
  • Preparation of work breakdown schedule (WBS) for planning.
  • Pre-mobilization inspection of contractor’s equipment and machinery for the construction works.
  • Knowledge of DEP’s and BS codes.

 

Site Engineer / Piping Supervisor                                                            (June 2008–May. 2009)

FLEBOD Logistic Services Limited

  • Supervision of 6” fuel gas line piping and installation for Trans amadi gas turbine unit and tie-in activities.
  • Coordination of welding and fit-up follow-up report for shop fabrication.
  • Coordination of lifting operations during spool installation.
  • Coordination and supervision of lifting operation for the positioning and aligning of fuel gas scrubber skid, Air compressor skid, water pump unit(skid), black start unit on cured foundation and fabrication and installation of all interconnecting piping spools.
  • Supervision of 4”, 3”, 2”, 1 1/2”, ¾”, ½” drain lines piping for oily water, lube oil and piping for 6” fire water (Hydrant) line network.

 

Materials Coordinator / Journey Manager                                                           (June 2007–May. 2008)

ALCON Nigeria Limited

  • Supervision and receiving of materials on arrival from overseas.
  • Coordination of material inspection and inventory of received materials.
  • Coordination of equipment and logistics to receive materials on site.
  • Coordinating with the QA/QC department for materials inspection and preparation of materials received inspection report.
  • Coordinating with the HSE department for proper analysis of JHA at area of work.
  • Follow-up with the HSE team for periodical certification of all lifting gears.
  • Ensuring all PTW’s are signed and approved before any lifting operation commence.
  • Coordinating with the HSE department for proper accessing of work area in-lieu of heavy lift.
  • Participate in weekly internal audit and monthly audit with client.
  • Participate in weekly and monthly EPC project progress status.
  • Follow-up of proper close out of all punch-list items during audit and pre-commissioning
  • Ensuring vehicles are properly maintained
  • Ensuring that vehicles and drivers carry all necessary documents, licenses and stickers for the operating areas including host state of operation.
  • Verifying that road risk assessments are carried out before start of journey.
  • Collating on monthly basis in vehicle monitoring system (IVMS) decoded result and checking for non-compliance.

 

Material Engineer                                                                                          (June 2004-April. 2005)

Planning Engineer                                                                                       (Aug. 2002-May. 2004)

Assistant Stores Supervisor (N.Y.S.C)                                                 (March. 2002-Aug. 2002)

ALCON Nigeria Limited

 

Trainee Engineer (Industrial Training, SIWES)                                          (Aug. 1999–Feb. 2000)

Shell Petroleum Development Company, Port Harcourt.

 

Key Work Achievements

  • Supervised the successful installation, modification of interconnecting spools and pre-commissioning of explosion proof pumps used for de-watering process at Ogboinbiri flow station (AGIP)     2010
  • Supervised the workshop pre-fabrication works and valve integrity test and repair works for the installation of HHP-2 separator for IDU NAG-2.                                                                   2010
  • Supervised the revamping of clough creek flow station (AGIP)                                           2009 / 2010
  • Involved in the site visit and planning for the 12” & 16” piping and installation works for IDU Early production NAG-1 crude oil export line tie-in to HP separator.                                            2009
  • Involved in the rehabilitation of 1,609 barrel process water reservoir tank and the installation of level switch on the atmospheric (ATM) separator at ogboinbiri flow station (AGIP)                     2009
  • Supervised the piping and installation of 6” fuel gas line and 6” hydrant line, 4”, 3”, 2”, 1 ½”, 1”, ¾” lube oil and oily water drain lines from the turbine unit.(ROCKSON ENGINEERING)              2008
  • Supervised the piping and spool installation works for main fuel gas scrubber skid, Air compressor Skid, Hydrant pump skid for trans amadi gas turbine.(ROCKSON ENGINEERING)                  2008

 

    In-House Training:

  • Basic survival swimming training.
  • Received Induction training in various H.S.E courses– Fire Fighting methods, Crisis Management, Contingency Management, Security management,
  • Received P.P.E awareness training, rigging and crane operations awareness training.
  • Trade Union Leadership Orientation Course.
  • Project Management Training (PMBOK, Primavera 6, Microsoft Project)

 

Professional Skills:

  • Computer Literate and proficient in the use of Microsoft Windows XP & Office XP
  • Knowledge of AutoCAD design software.
  • Knowledge of Primavera Project Planner
  • Knowledge of Microsoft Projects. 
  • Knowledge of SAP (MM Module).