Electrical Engineer, DesignTech, Hospital Building

START Date: 
June, 2009
END Date: 
January, 2010

Preparation of shop drawing for- Lighting system layout- Power system layout- Cable Tray and opening shaft layout- Cable routing layout- Earthing and Lighting protection layout Load calculation for: - Lighting system- Power system- Motor Control Centre (MCC) Line diagram and Load distribution diagram-Lighting system-Power system-Motor control centre (MCC)

Cable tray sizing for: - Power cables- LC cables- Cable feeder and Breaker sizing through - Voltage drop calculation -Short circuit current calculation- By considering correction feeder with ambient temperature, Lux/ illumination calculation- Interaction with the supplier for compromising the quantities- Bill of Quality /estimation- Cost / pricing- Casting- Testing- Handing over- Maintenance