8 years from a site engineer up to project manager + 2 years as a senior cost estimator, Sep. 91 – Oct. 01 Mediterranean Contracting Co, various residential projects
My position | Construction Manager (Apr. 01 – Oct. 01) |
Project name | Dar El Abtal for the air forces - Cairo -Egypt |
Project Budget | (8,620,762 LE) |
Project description | A resort include swimming pool & cafeterias & beach cabins and landscape areas |
|
|
My position | Senior Cost Estimator & Contracts, Tendering Department (May 99 – Apr. 01) |
Project name | Head Office, Cairo –Egypt |
|
|
My position | Construction Manager (Sep. 96 – May 99) |
Project name | El Sefarat Zone building, Cairo -Egypt |
Project Budget | (L.E. 8,396,668) |
Project description | Two residential buildings on a total area of 700m2, each building consisting of one basement, eight floors |
|
|
My position | Construction Manager (Jan. 95 – Sep. 96) |
Project name | Ahmed Nassim building - Giza -Egypt |
Project Budget | (9,879,185 LE) |
Project description | A high class residential building on Nile on area 1000m2 consisting of one basement , one ground floor including one squash court, one business center, one floor for servants, one floor for health club, one swimming pool and sauna, and seven typical floors each floor including one 1000m2 apartment |
|
|
My position
| Project Manager (Apr. 92 till Jan. 95) Construction Manager (Jan. 92 till Apr. 92) Site Engineer (Sep. 91 till Dec. 91) |
Project name | Al Azeez Belaah tower - Cairo -Egypt |
Project Budget | ((L.E. 4,833,432) |
Project description | Two Residential building on area 1200m2 consist of basement +ground floor+12 typical floors |