8 years from a site engineer up to project manager + 2 years as a senior cost estimator, Sep. 91 – Oct. 01 Mediterranean Contracting Co, various residential projects

START Date: 
September, 1991
END Date: 
October, 2001

My position

Construction Manager (Apr. 01 – Oct. 01)

Project name

Dar El Abtal for the air forces - Cairo -Egypt

Project Budget

(8,620,762 LE)

Project description

A resort include swimming pool & cafeterias & beach cabins and landscape areas

 

 

My position

Senior Cost Estimator & Contracts, Tendering Department (May 99 – Apr. 01)

Project name

Head Office, Cairo –Egypt

 

 

My position

Construction Manager (Sep. 96 – May 99)

Project name

El Sefarat Zone building, Cairo -Egypt

Project Budget

(L.E. 8,396,668)

Project description

Two residential buildings on a total area of 700m2, each building consisting of one basement, eight floors

 

 

My position

Construction Manager (Jan. 95 – Sep. 96)

Project name

Ahmed Nassim building - Giza -Egypt

Project Budget

(9,879,185 LE)

Project description

A high class residential building on Nile on area 1000m2 consisting of one basement , one ground floor including one squash court, one business center, one floor for servants, one floor for health club, one swimming pool and sauna, and seven typical floors each floor including one 1000m2 apartment

 

 

My position

 

Project Manager (Apr. 92 till Jan. 95)

Construction Manager (Jan. 92 till Apr. 92)

Site Engineer (Sep. 91 till Dec. 91)

Project name

Al Azeez Belaah tower - Cairo -Egypt

Project Budget

((L.E. 4,833,432)

Project description

Two Residential building on area 1200m2 consist of basement +ground floor+12 typical floors