Mohd Amirul Nazri Ismail
A Civil Engineer with 15 years experiences in multiple aspects of engineering design and management of project risks i.e in Large Infrastructure, Oil and Gas, General Insurance & Underwriting, Project Portfolio & Financing . My career has spanned various countries in some of the most challenging projects, locations; Laos, UAE, Pakistan and Hong Kong
(QUANTITATIVE COST | SCHEDULE RISK ASSESSMENT & CONTINGENCY MANAGEMENT )
Had delivered specific Quantitative Risk assessment via modelling simulations using Monte Carlo technique, which were aimed to ascertain appropriate level of contingency. These were succeeded with the used of sophisticated analytical tools: Primavera P6, Oracle Primavera Risk Analysis, @Risk and Safran Risk. The deliverables inclusive of Contingency Management and Probabilistic Risk Adjusted Cost and Schedule Models . The models were incorporated certain degrees of correlation, dependent and non-dependent time factors, risk factors, residual cost wise.
(CIVIL ENGINEERING)
Design Engineering risk assessment. Experienced in assessing soil mechanics and its impacts to Foundation Design & Construction, Value Engineering and Construct- ability and interface assessment between MEP, Systems, Architectures.
(PROJECT CONTROL)
Had developed Project Execution Plan for Oil & Gas and Infrastructures contracts. These were including Baseline Schedule Development and Management, developed Cost Estimate Accuracy model and supervise the integration of project control elements i.e. Finance, Procurement, Engineering and Construction with Quantitative Risk Assessment outputs.
(STAFF DEVELOPMENT EFFORTS) Intensify staff capabilities through training programs.
- Industry:
- Region: