Website Upgrade Incoming - we're working on a new look (and speed!) standby while we deliver the project

Ernest Hearn

First Name: 
Ernest
Last Name: 
Hearn

POSITION                               Senior Planning Consultant / Forensic Delay Analyst / Planning Manager     

NATIONALITY            South African

KEY FACTS.                 Valid Passport.

Expat Work.                Kenia, Mozambique, Swaziland, Visit Germany for Manufacturing Liason.

QUALIFICATIONS

Equivalent Diploma in Mechanical Engineering – Studied data metrics  at Unisa

RELEVANT PROJECT EXPERIENCE

Å        Driver Group Africa – Sasol Fire WaterSecond Life Cycle Replacement – Restructure contract programme for approval. Weekly and monthly reporting to client. Programme maintenance and manage contract changes thru Project Programme – ORWRP – TCTA / ANJV / Basil Read – New 1,8m pipe line from De Hoop Dam to Steelpoort Pump Station with all the infrastructure. Weekly and monthly reporting to client. Programme maintenance and manage contract changes thru Project Programme

Å        CMIJV, Lead Planner – Ingula Pumped Storage Scheme – main underground and civil contract including all facilities, emergency power and other services. Time Impact Analysis (TIA) for section 54 (fatal injured workers) and draft narrative, TIA for CE’s on extra rock supports in the tunnels and draft narrative, TIA for delay in handover by other contractors in the tunnels and draft narratives and TIA for CE’s on extra work in the tunnels and draft narratives.

Å       DB Thermal and SPX Company, Planning Manager –Medupi Power Stations & Kusile Power Stations – Turn key bag Filter Plant (24 Off). Time Impact Analysis (TIA) for PLA Calendar and draft narrative, TIA for on work stoppage by Hitachi and draft narrative, TIA for delay in handover of civil by other contractors and draft narrative, TIA for strikes and other man-hour delays and draft narrative. Turn Key Manufacture of Rotary Air Heaters for Medupi Power Stations & Kusile Power Stations. Turn Key Manufacture of Steam Air Heaters for Medupi Power Stations & Kusile Power Stations. Pressure Vessel Manufacturing for Sasol Refinery. Manufacturing of Steam Pre-heater’s for Medupi Power Stations & Kusile Power Stations.

Å        Alstom-John Thompson Boilers, Planning Manager – Project Controls/Proposal/Estimating Manager. Komati Power Station – Refurbish ESP, boilers, new So3 Plant & Piping – De-moth Ball Station. Numerous TIA’s for CE’s on extra work, man-hour and material delays and draft narrative. Grootvlei Power Station –EPCC Refurbish ESP’s and Convert ESP’s to Bag filters & new So3 Plant. De-Moth Ball Komati & Grootvlei Stations. Arnot Power Station – EPCC Convert ESP’s to Bag filters and upgrade Boilers, Mills and Turbines. Power plant IR and Go’s on various Power Stations. Turn Key Power Boiler for Caltex Refinery. Maintenance projects on Caltex Refinery.

Å        Alstom-John Thompson Boilers Planning Manager; Projects Control /Proposal / Estimating Manager - Komati Power Station– Replace Pipe Lines during Moth Ball Period -  Upgrade of all boiler plant. - Grootvlei Power Station – Replace Pipe Lines during Moth Ball period and  ESP & Bag Filter Maintenance Contract. - Arnot Power Station: ESP & Bag filters repairs and Boiler Plant upgrade. Numerous tenders raging from R100 000.00 to over a Billion Rand

Å        ICAL, Project Planning Manager –MOSGAS – Offshore Drilling Platform Modules. Construct as build programmes and TIA’s for all CE’s on extra work, strike and material delays on platform modules and draft narrative. MOSGAS – New Reformer Trains.  Construct as build programmes and TIA’s for all CE’s engineering delays, on extra work, strike and material delays on on-shore reformer trains and draft narrative. Two Turn Key Power Boiler for Mosgas Refinery

Å        Construction & Commissioning Planning

Aug 2013 to Sep 2013 - Self Employed - Consultant / Contractor    

Project Control and Construction Planning – Refurbishment of ESP

Å        IMS Process Plant (Pty) Ltd Chief Project Planner –SASOL Refinery – New Pitch Incinerator. Alusaf Aluminium Smelter – New gas cleaning plants. Columbus Stainless Steel – New Water Treatment Plant & New crystallizer plant. Beckets Coffee – new crystallizer plant. NCP – new evaporator plant. Midmar dam – Engeni water – Water Treatment Plant. Majuba power stations – bring water treatment plant out of mothball (De-moth ball).

Å        Atomic Energy Corporation, Chief Project Planner – Pelindaba – New Nuclear Fuel Enrichment Plant.

Professional Since: 
Jan-2010 (15.4 yrs experience)
Oldest experience: 
Jan 1973 (52.4 yrs experience, WARNING: 37.0 years variance with Professional Since)
Years Experience: 
43
Guild Accreditation: 
Awaiting Applicant
GPC Pilot Tester

Market Place

No results found... (try selecting a different content filter)