CURRICULUM VITAE

 

           Name                       Ø    SITAL MUKHERJEE

                     Date of birth             Ø    02/04/1966

           Nationality                Ø    Indian

          Marital Status           Ø    Married

         Educational Qualifi      ØBachelor of  Arts and Industrial Engineering.

                   Technical Qualifi       Ø   a)   Structural Engineering government of India.Calcutta.

                  Computer Knowledge Ø  Primavera Project Planner, Microsoft Project Planner, Microsoft Office and AutoCAD (Rel – 12, 13, 14)

          Total Experience       Ø    17.2 Years

 Professional Object  Ø    To seek highly challenging and satisfying career where I can utilize

my knowledge and   enhance my skills to meet the challenges and

growth of the organization and attain greater heights.

 Experience               Ø    Preparation of Master Construction program

Using Primavera Project Planner (P3, P5), MS. Project, MS Office

Micro planning, Updating Master Construction Program

Resources Planning, Generation of Various reports, Various Reconciliation Statements, Tracking of project status, Preparation of delay statement and analyzing - with respect to actual achievements Vs. Planned Milestones, - Like Monthly Information Statement (MIS), weekly and daily basis

 

Consolidated Contractors Group Offshore S.A.L 

January 2009 to Till Date                                                                       

Client:                      :        QATAR PETROLEUM (QP)

Nature of Work         :        To Preparation of Master Construction Programme, and preparation of project schedule in details for critical and special  packages, analizing and monitoring of project progress status. Define and coordinate specific activities and work tasks. Responsible for developing, measurement and reporting progress, including progress "S" curves

 

Consolidated Contracting International Co.

(June 06 to Jan 09)                                                                

Consultant                 :      Turner Construction Intrernational LLC ( TURNER )

 Nature of Work         :        To development of Master Construction Programme, preparation of project schedule in details for critical and special  packages, analizing and monitoring of project progress status, define and coordinate specific activities and work tasks, assign and allocate resources to competing activities, updates construction, site level and coordinated programme, developing Integrated CPM schedule which shows the sequence of events compatible with work breakdown structure, Coordinates schedule input from multiple contractors, teams and incorporate the information gathered into the integrated schedule, prepares short-term look ahead schedules and leads the update in routine progress meetings, responsible for developing, measurement and reporting progress, including progress "S" curves

 

DBB/BK GULF LLC

(December 2004 – June 2006)                                                                  

Client                       :        Department of Civil Aviation (DCA)

DUBAI AIRPORT (Expansion of Dubai International Airport) project Value US$ 150.9 Millions

Nature of Work         :      Planning of EPC for the Central Utility Services (Electrical & Mechanical) Electrical Power distribution from Power plant to Airport RMU/ Transformer/Substation (132Kv, 33Kv, 11Kv, 3.3Kv) for power supply and Net work system, Fuel Storege & distribution system, Emergency utility Services, Firefighting and Fire Alarm system for Expansion of  Dubai International Airport to achieve target and finish on time, according to client requirement, Preparing the Preliminary tentative construction schedules, Baseline construction programme. Monitors and forecasts progress of activities in schedules by assessing or measuring physical progress in engineering and field construction. Highlight problem areas and recommend remedial actions, Evaluates allocation of resources and provide recommendations to maintain required progress, Forecasts monthly expenditures and work progress for the project, Liaisons with all team leaders to communicate required completion dates and interfaces between responsible parties.

AIRMECH (Dubai) LLC 

(August 2002 – November 2004)                                                             

Client                       :        Dubai Aluminium Company

Contractor                :       ALSTOM  Power Norway's AS

Project                     :        Kestrel project  - Fume Treatment Plant for Portline Extensions (FTP - 1A, 2A, 3A & 4A) DUBAI ALUMINIUN COMPANY (DUBAL) project Value US$ 415.1 Million

Nature of Work         :                   To preparation and presentation to client Norway Fabrication of Reactors, Heavy piping, Portline duct, Structural Steel works for plan in Daily, weekly and Monthly Basis for project progress report (actual work done Vs Planned / Forecasted).Taking out material Installation quantities and final finishing progress report., daily analyzemanpower, Installation of project equipments and documentation log. progress S-Curves & Manpower Histogram with bar chart, Daily, Weekly  & Monthly basis progress report. preparation and Presentation of project progress and logistic report

ASTER , Abu Dhabi

(February 2000– July 2002)                                                                    

Client             :        ADNOC

Responsibilities of the job plan, Bar chart and scheduling the required manpower, material and Equipment for the  execution of the job on soft ware Primavera Project Planner. Preparation of manpower and cash flow of the jobs with graphical and tabular representations. Monitoring the of planned work and maintaining records of site actions using Automated computer system of the job under progress.  Project up dating the ongoing schedule with input as per the site works activities and site visits on weekly basis to report the status of each job with respect to target.         Preparing the Monthly and weekly construction progress report.

 

National Petroleum Construction Company (NPCC)

(September 1994 – December 1999

Client       :     Abu Dhabi Marine Operating Co. (ADMA-OPCO), QGPC, Oil and Natural Gas Corporation (ONGC) India, Engineers India Ltd. (EIL), Larsen and Toubro (L&T), Mazagon Dock Ltd. (MDL) India, TOTAL, JBO, ELF etc

 

Mazagon Dock Limited (September 1993 to August 1994)

Worked at offshore jack -up rig Working with engineering group for preparation of daily works activities and report to client, responsible for progress report, material take off, bill of material, assisting to Project engineers and coordinator for material handling 

Pioneer Engineering Co. Limited.

(July 1992 to August 1993)                                                                                             

Client                       :     Tata Iron & Steel Co Ltd.

Nature of Work         :     Preparation of documentation, design & detailing works for Modernization of tata hot strip mill, cock ovens, processing mill, Preparation of materials, shop drawings, material take off for procurement and monitoring of logistic planning, Installation of equipments. etc.

Professional Since: 
Sep-1993 (30.6 yrs experience)
Oldest experience: 
Apr 2010 (14.0 yrs experience, WARNING: 16.6 years variance with Professional Since)