A result oriented professional with over 4 years of rich experience in Planning, Project Management, Execution of Construction Works and Site Management. Currently serving Overseas AST Co. LLC, Dubai as Planning Engineer. Significant exposure in planning the entire programme of work and anticipating a contract’s demands in terms of labour, materials, equipment and technical challenges. Well versed in planning, executing and spearheading construction projects involving method engineering/ method statement, development, resource planning with a flair for adopting modern construction methodologies/ techniques in compliance with quality standards. Proficient in swiftly ramping up projects and within cost parameters. Successfully executed Refinery, Air Fuel Line Systems, District Water Cooling & Industrial Water Supply projects.

Core Competencies
Strategic Planning: Planning projects considering factors such as availability, current & future costs, and other economic projections. Preparing master project schedule & programs during tender and execution stage. Preparing master programmes, (Base Line Programmes, Catch Up Programmes, L-2 Programmes, L4 Program, Weekly and Monthly Program.). Developing Master Schedules and Resources Schedules (Micro Schedules, Matrix Schedule, Manpower, Material and Plants & Equipment Schedules). Conducting studies to develop data required for planning; preparing programs & schedules for material procurement and equipment to meet long term & current milestones.

Project Management: Finalising requirements and specifications in consultation & interaction with Consultants/ Sub-Contractors. Anchoring on-site construction activities to ensure completion of project within the time & cost parameters and effective resource utilisation to maximise the output. Participating in project meetings to evaluate project progress. Liaising with clients and consultants on project requirements.

Site & Construction Management/Resource Planning: Monitoring all construction activities including providing technical inputs for methodologies of construction & coordination with site management. Overseeing a team of Engineers on various projects and resolving bottlenecks. Updating material tracking schedules in accordance with contract schedule; ensuring timely availability of materials to minimize storage requirements while preventing negative schedule impact. Coordinating with site, procurement, accounts & quantity survey to ensure proper arrangement of resources, timely invoicing and realisation of payment. Coordinating with the Contracts Department in preparation of records for realization of claims.

Occupational Contour
Since May’08 with Overseas AST Co. LLC, Dubai as Planning Engineer

Project Executed     : Installation of District Cooling Pipes (May-2008 to Dec-2009)
Client                         : Tabreed Cooling Systems
Project Value               : AED 100 Million

Project Executed      : CONSTRUCTION OF FUEL TANKS FOR H.Q OF SUPPLY (Jan-10 to Present)
Client                         : DMW
Project Value               : AED 230 Million

Role                         : Handled the following tasks:
–     Developing & reviewing of short and long term plans to accomplish project targets.
–     Developing a Detailed Work Break Down structure for better tracking of the projects.
–     Preparing Master Base line schedule using Primavera 3.1.
–     Loading resources and cost in the Base line Schedule and also preparing S-Curves.
–     Creating progress statements highlighting the critical areas, mile stone activities, etc.
–     Preparing report on work front availability / material constraints on a regular basis and submitting it to the client.
–     Preparing Look a head programme and deliver to Execution team.
–     Monitoring of progress against Base line schedule.
–     Preparing Mitigation plan to catch up the delay occurred.
–     Periodic review of cost control along with Quantity surveyor.
–     Preparation of Extension of Time and Claims if project delayed due to unforeseen circumstances.

Aug’07 – Apr’08 with EDAC Engineering Ltd. (India), Jamnagar as Planning Engineer

Project Executed     : Erection & Commissioning of Sulphur Recovery Unit in Refinery
Consultant               : Reliance Engineers Associates Ltd., India
Client                         : Reliance Petroleum Ltd., India
Project Value               : INR 12 Million
Handled the following tasks:
–     Planning and managing materials from the site yard to the Construction Site.
–     Preparing plans for daily activities; ensuring that the required manpower is being held by Sub Contractors to carry out the daily erection activities.
–     Undertaking daily review of progress with Site Engineers through meetings.
–     Conducting weekly review of progress; reviewing and planning site activities in consultation with the Project Manager.
–     Developing & reviewing of short and long term plans to accomplish project targets.
–     Scheduling resources using Primavera 3.1; preparing S-Curves.
–     Creating progress statements highlighting the critical areas, mile stone activities, etc.
–     Preparing report on work front availability / material constraints on a regular basis and submitting it to the client.
–     Monitoring of progress against target plan using Primavera 3.1.
–     Periodic review of cost control along with Quantity surveyor.

Sep’06 – Aug’07 with Mahindra Consulting Engineers Ltd. (India), Chennai as Junior Planning Engineer

Project Executed     : Dewas Industrial Water Supply project
Client                         : MSK Projects (India)
Project Value               : INR 10 Million
Handled the following tasks:
–     Planning and managing materials from the site yard to the Construction Site.
–     Preparing plans for daily activities; ensuring that the required manpower is being held by Sub Contractors to carry out the daily erection activities.
–     Undertaking daily review of progress with Site Engineers through meetings.
–     Conducting weekly review of progress; reviewing and planning site activities in consultation with the Planning Engineer & Project Manager.
–     Developing & reviewing of short and long term plans to accomplish project targets with the Planning Engineer & Project Manager.
–     Creating progress statements highlighting the critical areas, mile stone activities, etc.
–     Preparing report on work front availability / material constraints on a regular basis and submitting it to the client.
–     Monitoring of progress against target plan using Primavera 3.1.




Scholastics

     Pursuing MBA (Project Management) from Alagappa University, India.
     Bachelors in Mechanical Engineering from Adhiyamaan College of Engineering, Hosur First Class marks in 2006.



IT Skills

Package               : Primavera (P3 & P5), Microsoft Project 2003
Office Tools          : Office XP 2000 & 2003, Office 2007
Others                : AutoCAD
Professional Since: 
Feb-2010 (14.2 yrs experience)
Oldest experience: 
Jul 2006 (17.8 yrs experience, WARNING: 3.6 years variance with Professional Since)
Years Experience: 
13

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.