Ahmad Mustafa Azhar

First Name: 
Ahmad Mustafa
Last Name: 
Azhar

 

 

July 2015 to Update

 

 

 

 

 

 

 

 

 

 

May 2008 to April 2015

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

June 2006 to April 2008

 

El-Seif Engineering & Contracting Co. (Riyadh)

Sr. Planning Engineer (MEP)

            Experience Detail:

§    Preparation of Baseline Schedule & Revised Schedule.

§    Activity Coding, Resource Calculation & Resource Loading.

§    Manpower Histogram.

§    Preparation of Look Ahead Schedules.

§    Lead construction team and Follow up with the target progress.

§    Progress Monitoring and preparation of Weekly / Monthly reports.

§    Monitoring Weekly productivity index and Weekly SPI.

§    Preparation of Cash Flow and Monitoring CPI.

Projects

v  King Abdullah Bin Abdul Aziz Project For Developing The Security Headquarters (KAP 2A) - Riyadh:

A SAR871 million project consist of 9 sub-projects includes 85 nos. multistory buildings, Sewerage Treatment Plant and 9 nos. sub-stations.

v  King Abdullah Financial District- Central Car Park-Riyadh:

Parcel 3.11, 2.15 and 1.04 consists of 3 car parks buildings

 

Drake & Scull International PJSC (Dubai)

Planning Engineer

            Experience Detail:

 

Projects

v  The Pointe Project at Palm Jumeirah Dubai:

§    A commercial project on Built-up area of 85,000m2 which consist of 2 Buildings Preparation of Baseline Schedule as per the contract conditions.

§    Calculating and Loading the schedule with all the resources like Man-hours and Equipment hours. (For forecasting the manpower requirements)

§    Work break down structure as per the project requirements.

§    Deciding the appropriate weekly and monthly progress report formats.

§    Preparation of control logs for Procurement (Long Lead) and subcontracting activities for monitoring during execution.

§    Implementation of MEP Schedule with project team.

§    Lead weekly planning meetings to ensure progress on track and enforce compliance to plan.

§    Initiating delay notifications / time extensions and claims.

§    Preparation of Monthly Progress presentation (in Power Point)

§    Close coordination with PM and Site team to enforce accurate progress monitoring system.

§    Close monitoring of logistics and procurement plan.

§    Preparation of Look Ahead Schedules

§    Reporting to Client weekly and monthly.

§    Updating the schedule and comparing the progress with target schedule.

§    Preparation of recovery schedules if requires.

§    Preparation of EOT Claims and narratives of each event.

G+2 Floors consist of restaurants \ shops with 5 nos. Electrical substations and Cooling Tower.

 

v  Laguna Tower Project at Jumeirah Lakes Tower:

43 Floors Tower + 3 Basements & Mechanical Floor

v  Royal Amwaj Resort & SPA at Palm Jumeirah Dubai:

A combination of multi stories apartment & Villas which includes 442 Apartments in two condominium buildings and 75 nos. Villas, consist of one Bed room, two bed room, Four Bedroom, Eight Bed room and Water Villas. Main Lobby, Back of House and SPA Village.

v  Sahara Mall – Extension Project at AlNahda, Sharjah:

Extension of 3 Floor mall with a basement car park and erection of New cooling Tower and interfacing with existing mall.

Al Hussaini Building Contractors   (Abu Dhabi)

Project Planner  /  Engineer

            Experience Detail:

Project : Construction of Labor Camps Buildings

§ Develop Construction Plan using P3,Resource Calculation, Resource loading, Cost Loading, Program update, Weekly Report, Monthly Report, Procurement Plan, Material Management.

 

September 2004 to June 2006

 

Omar Jabran Engineering Ind. Ltd (Pakistan).

Planner / Scheduling Engineer

            Experience Detail:

·      Tender Planning

·      Preparation of Manufacturing Schedules.

·      Preparation of Production Schedules.

·      Preparation of Procurement / Delivery Schedules.

·      Follow-up with Production, Manufacturing and Procurement Dept.

·      Lead Weekly Progress Meetings / Discuss Schedules

·      Progress Monitoring

·      Preparation and Submission of Weekly / Monthly Reports

February 2003 to August 2004

Ghani Glass (Pvt.) Ltd (Pakistan)

Assistant Engineer, Mechanical Workshop

            Experience Detail:

§ Planning the manufacturing sequence using MS Project.

§ Shop Floor Planning as per given target. 

§ Over all Supervision of Manufacturing shop.

§   Ensure to reach the target within given Production Plan.

§ Manage all activities of maintenance Department. 

§   Troubleshooting during processing.

·   Professional Qualification(2003–2005)

(1998–2002)

 

Preston Institute Of Management Science & Technology (Pakistan)

     Bachelor of Technology (Mechanical) in 1st Div (3.3 GPA).

PakSwiss Training Center     (Karachi, Pakistan)

Four Years Specialized Diploma in Mechanical Technology.

·   Academic Qualification(1996–1997)

Little Folk’s School    (Karachi, Pakistan)

Matriculation.

·   Computing skills

·   Personal Information

 

Primavera 6 V8.3 (PPM & EPPM), Primavera 3.1, Ms Project, Pro Engineer Wildfire 2.0, UniGraphics NX 2, AutoCAD 2004 2D & 3D, Master Cam 2D & 3D, Alpha Cam 2D & 3D, ArtCut 2005, Ms Office, Windows and Internet.

 

 

Name                        :           Ahmad Mustafa Azhar

Nationality                 :           Pakistani

Passport No.                        :           AP1849923

Marital Status            :           Married

Driving License         :           With Valid UAE and KSA Driving license

Date of Birth             :           9th May1981

 

Professional Since: 
Sep-2006 (18.7 yrs experience)
Oldest experience: 
May 2008 (17.0 yrs experience, WARNING: 1.7 years variance with Professional Since)
Years Experience: 
7

Market Place

No results found... (try selecting a different content filter)