Website Upgrade Incoming - we're working on a new look (and speed!) standby while we deliver the project

anthony domiano

First Name: 
anthony
Last Name: 
domiano

Anthony C. Domiano

17829 Suma Lake Dr.

Livingston La. 70754

(985) 520-1605

neno872@yahoo.com

 

 

OBJECTIVE

 

Obtain long term employment with an established company owner which offers good benefits, competitive wages, training, and career advancement opportunities. Utilize my experience, skills, and abilities to contribute as a valuable asset to the company.

 

SKILLS & ACCOMPLISHMENTS:

 

·       Self-motivated; strong initiative; maintains high energy level, adapts well to new ideas, procedures and techniques.

·       Strong ability to work well with others in cross-functional teams. Strong communicational skills with the ability to communicate ideas to a wide range of groups.

·       Demonstrates role model behavior while supporting the client’s principles and values. Demonstrates support for diversity, leadership, teamwork, and customer focus. Creates and promotes an environment of trust and teamwork through actions and behaviors. Facilitates dialogue well & possess strong listening skills.

 

EXPERIENCE:

 

Planner/Scheduler, Maintenance Enterprises L.L.C (MEI), Williams Olefins Plant Geismar Louisiana and Marathon Garyville Louisiana

(February 2014 to Present)

 

·       Locate contractor scope of work.

·       Gather necessary drawings and documents.

·       Perform field walk downs with Operations Rep and/or Area Lead.

·       Input detailed job plans into P6 and make all internal logic ties.

·       Responsible for planning all disciplines of work per the contractor matrix (scaffold, insulation, paint, inspections, torque activities, cranes ect.)

·       Complete requisitions for all needed material

·       Compile required planning package to be turned in to Area Lead for approval.

·       Interface with contractor QC for continuity between job plans and QC packages

·       Provided general constructability review of all planned work assigned.

·       Plan and schedule Change Orders/Turnaroud Work Request during Turnaround schedule.

·       Coordinating activities across different organizational functions.

·       Ensure a safety conscious work environment and participate in daily safety meetings.

 

Material Coordinator/, Wyatt Field Service, Exxon Mobil Chalmette and Valero St Charles

(March 2013 to February 2014)

 

·       Coordinates and expedites flow of materials, parts, and assemblies between sections or departments, according to production and shipping schedules or department priorities, and compiles and maintains manual or computerized records: Reviews production schedules and related information and confers with department supervisors to determine material requirements to identify overdue materials and to track material.

·       Requisitions material and establishes sequential delivery dates to departments, according to job order priorities and material availability.

·       Compiles and maintains manual or computerized records, such as material inventory ,in-process production reports, and status and location of materials.

·       Ensure a safety conscious work environment and participate in daily safety meetings.

 

Senior Mechanical Planner/Field Engineer, Entergy Corporation, Grand Gulf Nuclear Plant, Port Gibson, MS

(March 2012 to March 2013)

 

·       Develop and issue work orders for online maintenance.

·       Perform field walk down.

·       Review/Approve Engineer Change Document for the Planning Department.

·       Develop and review weld doc’s.

·       Verified man hours, baseline plans, baseline materials. Identified scaffold locations, insulation removal points, instrument removal /disconnects as related to general mechanical work.

·       Trained in Indus Asset Suite

·       Trained in Welding Coordinator Software

·       Ensure a safety conscious work environment and participate in daily safety meetings.

·       Obtain and maintain requirements for nuclear plant unescorted plant access.

 

Senior Mechanical Planner/Field Engineer, Shaw Stone and Webster, Grand Gulf Nuclear Plant, Port Gibson, MS

(June 2011 to March 2012)

 

·       Develop and issue work orders, for online maintenance, EC’s, and civil activities

·       Develop and issue Refuel Outage work orders

·       Trained in Indus Asset Suite

·       Trained in Welding Coordinator Software

·       Perform field walk down with craft supervisors

·        Ensure a safety conscious work environment and participate in daily safety meetings

·       Obtain and maintain requirements for nuclear plant unescorted plant access.

 

Senior Mechanical Planner/Field Engineer, Sun Technical, Watt’s Bar Nuclear Plant, Spring City, TN

(February 2009 to June 2011)

 

·       Develop and issue work orders, initiate and pursue closure of FCR’s

·       Walk down EDCR’s with design and field engineer and craft supervisors.

·       Provide work order status for a two week look ahead, maintain a walk down log

·       Track latest revisions of procedures, reference drawings, implementation drawings and FSKs required to perform work are current in the WO.

·       Ensure a safety conscious work environment and participate in daily safety meetings.

·       Qualified Independent Reviewer.  Review work orders for adequate technical content.

·       Obtain and maintain requirements for nuclear plant unescorted plant access.

·       Trained in Maximo and Swap work order planning.

 

Field Planner/Outage Coordinator , JV Industries/ CDI Engineering, Channelview, TX

(October 2007 to February 2009)

 

·       Reported progress daily to the assigned lead planner.

·       Reviewed drawings & made initial field walks with lead planner.

·       Reviewed Inspection Test Plans (ITP), Equipment History reports, Mechanical Integrity Recommendations, Unit Inspection plans, Drawings and other documents.

·       Verified man hours, baseline plans, baseline materials & blind locations / sizes. Identified scaffold locations, insulation removal points, instrument removal /disconnects as related to general mechanical work.

·       Provided general constructability review of all planned work assigned.

·       Developed field sketches and took Digital photographs of all scope items.

·       Provided lead planner with data gathered after “Field Walk Downs”

·       Reviewed P3 plans for pre-identified high work load areas to effectively aid in reducing manpower overlaps & outage durations.

 

Superintendent/Field Planner, Wyatt VI, St. Croix, VI

(2005 to 2007)

 

·       Supervise and direct foreman and craftsman in daily turnaround activities.  Coordinate and level manpower needed to execute turnaround.

·       Compliance and working knowledge of Primavera schedules.

·       Interact and coordinate with Engineering, Operators, Maintenance, Contractors, and Management to complete projects incident and injury free, on time and on budget.

·       Plan scheduled turnarounds and emergency outages; step out scope items, read and mark up Process and Instrumentation Diagrams (P&ID’s) and Plot Plans, estimate job duration and man hours.

·       Prepare requisitions for materials and tools.

·       Provide leadership for safety, accident prevention and fire prevention.

 

References available upon request

Professional Since: 
Oct-2003 (21.8 yrs experience)
Oldest experience: 
Nov 2007 (17.7 yrs experience, WARNING: 4.1 years variance with Professional Since)
Years Experience: 
0

Market Place

No results found... (try selecting a different content filter)