Website Upgrade Incoming - we're working on a new look (and speed!) standby while we deliver the project

Prabin Kumar

First Name: 
Prabin
Last Name: 
Kumar

Prabin Kumar

BE(Mechanical), PMP, SCPM                                    

Senior Planning Engineer, Brunei Shell Petroleum     

 kumarprabin@gmail.com;   kumarprabin@hotmail.com

+673-    8619242 (Mob) / 3333394(Res)       

 

Project Planning & Control Professional with 18 years of comprehensive working knowledge on Oil & Gas (Onshore / Offshore) project, this includes 5 years as Lead Positions. Have extensive field experience and formal training on Schedule, Cost, Risk and Scope Management.

QUALIFICATION    :  B.E. (Mechanical), Project Management Professional (PMP), Stanford Advance Project Management (SCPM)

 

SOFTWARE SKILL  :  (Scheduling)   - Primavera P6 (Version 5 to 8.2 / P3), Microsoft Project

                             (Risk Analysis)- Primavera (Pertmaster) Risk Analysis V8.7, Palisade @RISK

                             Excel (Adv. level), Power Point, Word

 

 

EXPERIENCE OUTLINE

 

Diversified Project Planning & Control experience with advance level skills on Schedule, Cost and Risk Management within EPC industry at Project or Field execution level. Over last 5 years, performing a proactive leadership role on Planning & Control and assisting Project Manager on maintaining both business and project objectives.

 

  • Development of completePlanning Package includes WBS Creation, Management Schedule (Level II / I), Control Schedule (Level III), Progress Measurement System, and Estimation & Loading of Resource.

Development of Detail Work Schedule (Level IV / V), Periodic Schedule Update, ScheduleAnalysis and Control, Identification of Critical & Near-Critical Path/ Activities, Tracking Progress usingEarned Value Technique, Resource Monitoring, Scope Management &Change Control

Perform Integrated Activity Planning between Projects, manage Interface and optimize Resources deployment and productivity.

  • Risk Management: Facilitate Risks & Opportunities workshop to aid Risks Identification and its Qualitative Assessment. Perform Quantitative Schedule / Cost Risk Analysis using Primavera (Pertmaster) Risk Analysis / Palisade @RISK modeling.
  • Prepare, take approval and implement all Project Control Standards / Procedures. Contribute on development of Project Execution Plan.  
  • Production of all Project Progress Reports, Management Reports, Presentation Package etc.
  • Contract Management:Contribute Tender / Bid Document Preparation, Sub- Contract Bid Analysis & Contract negotiation. Contract Formulation, Contract Administration.
  • Conversant with Health, Safety and Environment (HSE) Management System–Standards and Policies/Procedures

 

 

EMPLOYMENT HISTORY

 

  • Sr. Planning Engineer (Lead Planner)                Brunei Shell Petroleum, Brunei – (Current)
  • Lead Project Controller (MPMT)                       Chiyoda corporation, Qatar        
  • Senior Project Control Engineer                       Petrofac International Limited, Egypt     
  • Planning Engineer                                         Hyundai Heavy Industries Co. Ltd, Kuwait
  • Senior Planning Engineer                                Bentini Namfatt Energy, Sudan   
  • Assistant Manager (Project)                           Oswal Chemical & Fertilizers Ltd, India
  • Engineer (project)                                        Oswal Petrochemical Limited, India        

 

EXPERIENCE DETAILS

                      

Company      : Brunei Shell Petroleum Company, Brunei                (Apr 2010 – Till Date)

Position        : Senior Planning Engineer (positioned as Lead Planner for 3 projects)   

Project         : Champion Water Flood Projects (Projects Cost: $4 Billions (Facilities- $ 1.7 Billions))

 

Project DescriptionRenovation of Champion Oil field Facilities to increase the ultimate recovery (26 MMm3 by 2037) of oil through water flooding.  

Major Scope– Drilling over 130 new wells, Construct of nine new Offshore Wellhead Platforms, one Auxiliary & one Production platform, Power Generation Plant, Water Plant, Renovation of existing platforms, Pipelines / Umbilicals installation.

Responsibilities

  • Development and implementation of complete planning package for individual Projects this includes Level III Control Schedules, Level II Management Schedule, and Integrated Level- II Project schedule.
  • Prepare Phase end review Packages & obtain formal approval for Project successive phases.
  • Conduct Risks & Opportunities Workshops and facilitate Risks identification, Risk Qualitative Assessment & quantification and Response Planning.Perform Schedule / Cost Quantitative Risk Analysis using Primavera Risk Analysis (Pertmaster) / Palisade @Risk Tool.
  • Estimate and load Man Hour resources to schedules, Perform resources levelling in accordance to resource availability (Man-Hours, Offshore Floating Resources, offshore accommodation etc) and Project Priority.
  • Perform Integrated Activity Planning (IAP) between all Projects, Operation and Subsurface Activities. Identify all potential clashes, manage interface and ensure schedules alignments. Optimize shared resources and its productivity.  Prepare Integrated Barge Schedule.
  • Liaise and assist Campaign Planner to ensure execution of all Campaign / shut down related project work. Assist development of Campaign Schedule.
  • Develop and implement Progress measurement system, Monitor & Control Project Progress using Earned Value Management (EVM) technique.
  • Supervise & mentor Company Planning Engineers. Govern Contractor’s Planning Activities.

 

 

Company      : Chiyoda Corporation, Qatar                                   (July 2008 - Apr 2010)

Position        : Lead Project Controller (member of Master Project Management Team)        

Project         : RasGas Long Term EPCm Contract           (Contract Value: 1.1 Billion QR plus)

 

Project DescriptionEPCm service contract for 5 year Engineering, Procurement & Construction Management (EPCm) services.

Major Scope – He Ph-II FEED, Irrigation Water Disposal, Tr. 1 & 2 Turbine Ventilation and F&G System Upgrade, Beach Valve II, Replacement of Scrub Column, FAU- 2A Quayside MEG Storage Facility FEED, Low NOx Retrofit of Boilers / Frame 7 Turbine, Installation of CP system for Onshore Well Injection Casing etc.

Responsibilities

  • Contribute in formulation of RasGas Long Term EPCm Contract.  Develop & implement Project Control Manuals / Procedures. Formulation of KPI for EPCm Contract.
  • Prepare Service Proposal for individual Projects under EPCm Contract (incld. Project Execution Plan, Lev-2 Schedule, Cost Time Resources (CTR), and Estimate Cost etc.), Attend post bid clarification meeting with Client, Assist Client on Service Order development.
  • Prepare complete planning Package (WBS, Level III Baseline Schedule, Project Execution Plan etc) for each awarded project. Assist & Mentor individual Planning Engineer for further monitoring & Control of Projects. Develop Progress measurement technique & Performance measurement Baseline for individual Projects.  Monitor & Control Project Progress using EVM technique.
  • Coordination with Project Home Office (Yokohama) for development of Service proposal, Project Progress, Invoicing, Cost report etc.
  • Prepare an Integrated project Progress Report (including Integrated Schedule, S-Curve, VoWD, Cost Performance report, HSE etc.) for all awarded projects. Assist, Review & release of individual project progress report.

 

 

Company      : Petrofac International Ltd, Egypt                                    (June 07- June 08)

Position        : Senior Project Control Engineer    

Project         : Salam Gas Train -3 & 4 (Khalda Petroleum)         (Project Cost:  $ 382 Million)

 

Project Description- EPCC contract for construction of two new Gas Trains (Train 3 & 4)

Major Scope– 2 nos. of Gas Train (2 x 100 mmcfd @ 100 bars & 14000 barrels condensate) with other associated utilities (Power generation, Hot Oil Heater, Water Treatment, Flare etc)

Job Description

  • Develop & Maintain Project Baseline (Level III) Schedule, Level -4 Detail Constructions, Pre-commissioning & Commissioning Schedule.  Prepare Recovery / Revise schedule as & when required. Develop & maintain Project measurement System (PMS), Perform Earned Value Management (EVM) & Variance Analysis. Estimate required Man-Hour resources, Perform resources loading and levelling as per resource availability.
  • Prepare Progress Reports (Weekly & Monthly). Prepare Monthly / Interim Management Reports / Presentation.  Validate Sub-Contractor’s project controls deliverables and progress reports, Get monthly / Weekly progress certification from client and assist in invoicing. Co-ordination with Project Home Office, Client and Sub-contractors.

 

 

Company      : Hyundai Heavy Industries Co. Ltd, Kuwait                        (Apr 06- May 07)

Position        : Planning Engineer    

Project         : KOC Crude Export Facilities Project          (Project Cost:  $ 1.3 Billions)

 

Project Description- EPCC Contract for providing a new Crude Export Facilities

Major Scope– Two nos. of Tank Farms (19 nos. of Crude Oil Double deck Floating roof Tanks -11,406,000 BBLS capacity), Cross Country Pipeline (5 x 48”), Pumping Station (14500 T/hr x 3 stream), Calm Buoys – 4 nos. with 56 inch Loading Line (Metering Skid - Calm Buoys).

Responsibilities

  • Develop & Maintain Project Baseline (Level III) Schedule, Level -4 Detail Constructions, Pre-commissioning & Commissioning Schedule.  Prepare Recovery / Revise schedule as & when required. Develop & maintain Project measurement System (PMS), Perform Earned Value Management (EVM) & Variance Analysis. Estimation, Loading and Levelling of Man-Hour resources on Schedule.  
  • Prepare Progress Reports (Weekly & Monthly). Prepare Monthly / Interim Management Reports / Presentation.  Validate Sub-Contractor’s project controls deliverables and progress reports, Get monthly / Weekly progress certification from client. Co-ordination with Project Home Office, Client and Sub-contractors.

 

 

Company      : Bentini Namfatt Energy, Sudan                                         (Aug 04- Mar 06)

Position        : Senior Planning Engineer    

Project         : Melut Basin Oil Development (PDOC)        (Project Cost:  $ 250 Millions)

 

Project Description- EPCCContract to construct Six Nos. of Crude Oil Pumping Stations   for Transportation of   crude oil (320,000 BPD) from Unity to Port of Sudan.

Major Scope– Six no of Pumping Station, each having 4 nos of Crude Oil Pumps (@1100 m3/Hr at 1050 m head with other associated utilities )

Responsibilities

  • Develop & Maintain Project Baseline (Level III) Schedule, Level -4 Detail Constructions, Pre-commissioning & Commissioning Schedule, Recovery / Revise schedule as & when required. Analyse and highlighting critical Activities, Evaluating delay impact and finding remedies. Develop & maintain Project measurement System (PMS), Estimation, Loading and Levelling of Man-Hour resources on Schedule.  
  • Prepare Progress Reports (Weekly & Monthly), Monthly / Interim Management Reports / Presentation.  Preparation of Tabular & Graphic Report for Construction Equipment Loading, Manpower Deployment. Develop & maintain Procurement Tracking Register and Technical Document Register. Validate Sub-Contractor’s project progress reports, Get monthly / Weekly progress certification from client and assist in invoicing. Co-ordinate with Client and Sub-contractors.

 

 

Company      : Oswal Chem & Ferts Ltd/ Oswal Petrochemical Ltd, India   (Aug 95- Jul 04)

Position        : Assistant Manager (Projects)        

Project         : Grass Root Phosphate Fertilizers Complex / Low Density Poly Ethylene Plant   

                                                                   (Project Cost:  $ 600 Millions / $ 350 Millions)

 

Project Description–

 

  1. Construction of Grass Root Phosphate Fertilizer Complex.

Major Scope– Di- Ammonium Phosphate Plant (3 X 140 TPH), Phosphoric Acid Plant ( 2650 TPD), Sulfuric Acid Plant (2 X 3750 TPD), Captive Power Plant (2 x 55 MW), Ammonia Storage Unit, Water Treatment Plant, Instrument / Plant Air and Other Utilities).

  1. Construction of Low Density Poly Ethylene Plant (Alcohol based).

Major Scope– Low Density Poly Ethylene Plant – 40 TPH, Industrial Alcohol Plant - 120 KLPD)

 

Job Description

  • Responsible for complete Project Management including Schedule, Cost, Change and Contract management for Phosphoric Acid Plant, LDPE and Captive Power Plant.

 

  • Managing all Capital Projects from Phosphoric Acid Plant, Sulphuric Acid Plant, Di- Ammonium Phosphate Plant and Captive Power Plant.

 

  • Review /validate Contractor Schedule, Oversee Resource Estimation, deployment and optimization. Integrated Construction Equipment Schedule preparation, Manage and control resources (Man-Hours, Construction Equipments, Bulk Material /Consumables).  Measure & Control Project progress. Analyse / highlights Critical Activities, Prepare Project progress Report, Review Contractor’s work progress and validate progressive Invoices. Liaise with PMC & Contractors.

 

 

 

 

 

 

 

 

 

OTHER DETAIL

                                   

Date of Birth      - 01 September, 1971                 Marital Status        - Married

Passport No       - Z 2045956 (Valid till June ’20)     Current Package    - 8000 USD + Benefits 

Nationality         - Indian                                     Expectation           - Negotiable

                      











 

Professional Since: 
Sep-1995 (30.1 yrs experience)
Years Experience: 
0

Market Place

No results found... (try selecting a different content filter)