Self-driven and personable, with 15 years broad experience in the aerospace industry. I have a strong background in both engineering and project management and control. The high pressure environments in which I have worked have often required me to think on my feet, provide creative practical solutions and practice a robust management of risk and forward planning. I have good team building and networking skills, am approachable and open minded, and am looking for my next challenge in a project management or planning role.
EMPLOYMENT HISTORY
Assystem Ltd
Jan 2012 – Present Project Manager - Airbus A350 Root End Front Fairing
A challenging role over a short time frame, joining an under-performing project late in the life cycle with the aim of delivering as soon as possible in order to minimise the costs incurred for late delivery. This role includes:
- Managing a project team of 30, split between the UK and Spain
- Identifying key personnel with regards to both technical competencies and influence over other team members
- Quickly building team morale and gaining the confidence of team members to maximise productivity with the resources available
- Building a project plan from scratch using Microsoft Project, identifying the critical path and bottlenecks driven by resource limitations.
- Re-allocating resources to mitigate and minimise the impact of bottlenecks
- Detailed planning and close management of critical path activities and key milestones
- Introduction of KPIs to highlight improvement in project performance
- Managing customer expectations whilst installing credibility in the project
EADS Astrium Ltd
April 2008 – December 2011 Senior Structures Engineer
A diverse role that primarily involved leading multi disciplinary teams in the development of production ready prototype spacecraft structures. Management of several projects simultaneously was necessary. Activities included:
- Mechanical lead engineer for the CSO, Bepi Columbo and GAIA spacecraft
- UK project focal point for European wide lean engineering initiative; analysing and modifying design processes to increase interface efficiency across sites.
- Project management of R & D into emerging and disruptive technologies
- Schedule and financial management of design operations; managing budgets for both resource and materials / parts
- Mentoring 6thform students in projects involving the design and production of spacecraft replica models in order to promote engineering in schools
EADS Astrium Ltd (Continued)
July 2005 – June 2008 Design Office Team Leader
3D modelling and detail design of various antenna structures and mechanical assemblies. Responsibilities included:
- Concept and detail design of antenna systems and structures.
- Leading a design office team often acting as the prime contractor; interfacing with and managing data supply from international suppliers.
- Complete design life cycle management and schedule control of drawing release.
- Best practices champion for the UK wide design office.
January 2002 – July 2005 Project Controller / Technical Co-ordinator
Worked within the operations management team, analysing project cost and schedule performance. Responsibilities included:
- Rolling out new cost control process throughout Antenna Business Department.
- Training of personnel to use new cost reporting methods and tools.
- Creation of product cost models to improve accuracy of bid estimates.
- Creating comprehensive work package descriptions and negotiating budgets.
- Obtaining cost and schedule updates for analysis, and presenting data at team meetings.
April 1999 – December 2002 Supply Chain Product Control
- Management of the JIT supply of materials and parts into production areas.
- Driving the schedule to meet project requirements and stock availability.
- Balancing inventory levels to optimise against cost and risk.
- Reducing inventory for production areas through improved stock control processes, achieving up to 35% reduction.
September 1997 – April 1999 Trainee Manufacturing Engineer
- Implemented change of production area layout and process flow, implementing 5S, JIT, MRP, Kanban and Kaizen.
- Creation of paperless works order system for production areas.
EDUCATION
Present: Reed Online
Currently undertaking a Prince2 self-study course, estimated completion date Sept 2012
July 2003: University of Hertfordshire
B.Eng Hons: Manufacturing Systems Engineering Grade: 2:1
July 1997: St John’s College, Portsmouth
2 A-Levels: English Literature Grade C, Economics Grade B
10 GCSE’s: 8 Grade A’s including English, Maths and Physics, 2 Grade B’s
WORK PACKAGES
General: Microsoft Office
Schedule Control: Primavera (P3)
Microsoft Project – Certified: MSP 2010, Managing Projects
Process Mapping: Visio
CAD: CATIA V5 & V4
FEA: NASTRAN
Femap
MRP / ERP: SURF (Oracle based)
- Industry: